Monthly Agreement Reports
May 2024
Master Agreement Commitments as of May 2024.pdf
Subconsultant Commitments as of May 2024.pdf
June 2024
Master Agreement Commitments as of June 2024.pdf
Subconsultant Commitments as of June 2024.pdf
July 2024
Master Agreement Commitments as of July 2024.pdf
Subconsultant Commitments as of July 2024.pdf
6M8119 (AECOM / TSE)
2017
July-September
6M8119A1 - Concord Station Improvements (170914).pdf
6M8119A02-01 - HMC Central Warehouse and Substation F - Standby Power (170927).pdf
October-December
6M8119A03 - Lake Merritt Plaza Improvements – Phase 1 (171012).pdf
6M8119A06-01 - Downtown Berkeley Southern Concourse Entrance Reopening (171003).pdf
6M8119A07 - HMC Maintenance and Engineering Shop Building (171107).pdf
6M8119A08-01 - Systems Support for New Vehicle VATC (171027).pdf
6M8119A10-01 - Switch Power Cabinet Replacement (171109).pdf
6M8119A11-01 - Balboa Park Phase 2 – Design Services During Construction (DSDC)(171220).pdf
6M8119B01-01 - High Density Transit Station CCTV Tunnel Hardening at BART (171003).pdf
6M8119B02-01- M-Line Cable Replacement MVS-MGP-MBP (171213).pdf
6M8119B3 - Security Engineering Services (171003).pdf
6M8119B05-01 - A-Line Cable Replacement ANA-ACO (171219).pdf
6M8119B09-01 - BART Facility Standard Traction Power Support Services (171003).pdf
6M8119B10 - Engineering Services to Support Computer Systems (171020).pdf
6M8119B12 - Measure RR Traction Power Facility Replacements (171109).pdf
6M8119B14 - NS MUX (171201).pdf
6M8119C01 - Asset Planning Data and Modeling Supports (171103).pdf
2018
January-March
6M8119A03-02 - Lake Merritt Plaza - Phase 2 (180213).pdf
6M8119A04-02 - Lake Merritt Transit Operations Facility – Phase 2 (180206).pdf
6M8119A12-01 - Real Time Display Lifecycle Replacement (180123).pdf
6M8119B11-01 - Wayside Sign Inventory (180109).pdf
April-June
6M8119A1-02 - Concord Intermodal Improvements (180410).pdf
6M8119B16 - Systemwide Track Switch Speed and MUX Assessment (180504).pdf
July-September
6M8119A11-02 - Balboa Park Phase 2 – Design Services During Construction (DSDC)(180703).pdf
6M8119A14-01 - SVBX Support Services (180814).pdf
6M8119B13-01 - OEG DSDC, Monitoring and Control System Support (180904).pdf
October-December
6M8119B17 - Asset Management Data and Modeling Support (181206).pdf
2019
January-March
April-June
6M8119A14-02 SVBX Support Services (190514).pdf
6M8120 (HNTB / FMG)
2017
July-September
October-December
6M8120A01 - Supplemental Design Services During Construction (DSDC) (171107).pdf
6M8120B01 - Power Transformer Replacement at Willow Pass Road (171114).pdf
6M8120B02 - Oakland Shops Spur Track G Spur Extension (171219).pdf
6M8120C01 - eBART Operations FY 2018 (171201).pdf
2018
January-March
6M8120A02 - Balboa Park Station Kiss and Ride Preliminary Design (180207).pdf
6M8120A03 - Accessibility Improvement Program (AIP) Phase 1A (180207).pdf
6M8120B04 - K Line Interlocking Replacement (180105).pdf
6M8120B05 - Train Control Engineering Support Services (180228).pdf
6M8120B06 - Cast Coil Transformer Replacement (180102).pdf
6M8120B07 - Project Management and Technical Support Services (180202).pdf
6M8120B08 - 34.5 kV Blocking System Phase II Design (180223).pdf
6M8120B09 - Conduit Testing (180320).pdf
6M8120B10 - Train Control Engineering (180223).pdf
April-June
6M8120A01-02 - El Cerrito Supplemental DSDC (180518).pdf
6M8120A04 - Elevator Lobby LED Lighting Improvements (180412).pdf
6M8120A05 - TCMP and CBTC CADD Support (180404).pdf
6M8120B11 - C-Line (CLA – CCO) 34.5 kV Cable Replacement (180515).pdf
6M8120B12 - Wayside Coverboard Antennas (180425).pdf
6M8120B19 - Replacement of Hanger Rods at Catwalks at A-Line (180515).pdf
6M8120B20 - Cross Passage Doors Condition Inspection (180619).pdf
6M8120B22 - Structures Projects Integration Team (180508).pdf
July-September
6M8120A01-03 - El Cerrito Supplemental DSDC – Amendment 2 (180718).pdf
6M8120A03-3 - Accessibility Improvement (AIP) – Phase 2 (180831).pdf
6M8120A06-01 - BART Earthquake Safety Program DSDC for TBT (180718).pdf
6M8120B02-02 - Oakland Shops Spur Track G Spur Extension Supplemental Work Plan (180921).pdf
6M8120B04-02 - K-Line Interlocking Replacement Phase I - Amendment 1 (180815).pdf
6M8120B13 - K-Line 34.5 kV Ductbank Replacement (180807).pdf
6M8120B15 - R-Line Tunnel Water Mitigation (180803).pdf
6M8120B16 - M-Line Tunnel Water Mitigation (180803).pdf
6M8120B23 - Removal of Existing Train Control Cables (180711).pdf
6M8120B24 - M&E As Needed Landscape Architecture (180727).pdf
6M8120C01-02 - eBART Program Management Services (180717).pdf
6M8120C03 - Amtrak Oakland Maintenance Facility Diesel Exhaust Fluid System (180731).pdf
October-December
6M8120A01-04 - Supplemental DSDC Services for BART’s El Cerrito Del Norte (ECDN) (181023).pdf
6M8120A03-02 - AIP Phase 1B – Final Design (181130).pdf
6M8120B3 - Next Gen Fare Gates (181010).pdf
6M8120B07-02 - PM and Tech. Support for M&E Electrical Group (Fire Alarm & Met G)(181204).pdf
6M8120B11-04 -Retaining Wall by CXH Gap Breaker (191213).pdf
2019
January-March
6M8120A01-05 - BART El Cerrito - Supplemental Work Plan 4 (190117).pdf
6M8120A07 - Wayfinding Improvement Phase 4 (190326).pdf
6M8120B01-02 - CWS Transformer Replacement (190102).pdf
April-June
6M8120B17-2 - Water Intrusion through Trackways & Platforms Joints A Line (190625).pdf
6M8120B18-2 - Water Intrusion Repairs, CR Line_ECDN R50 CHANGE NOTICE (190507).pdf
6M8120B18-3 - Water Intrusion through (190625).pdf
July-September
6M8120B02 - Oakland Shops Spur Track G Spur Extension (190709).pdf
October-December
6M8120B11-03 -C-Line 34.5 kV Cable Replacement (191213).pdf
6M8120B19-02 - Additional Design Services for PS&E (191213).pdf
2020
January-March
6M8120A03-04 – AIP Phase 1 – North Berkeley Handrail Modifications (200326).pdf
April-June
6M8120C03-02 – OMF Facility Diesel Exhaust Fluid System (200501).pdf
2021
April-June
6M8120B19-01-Additional Design and DSDC Services (070621).pdf
6M8121 (Parsons Transportation Group)
2017
July-September
October-December
6M8121A01 - UT RFP Development (171219).pdf
6M8121A02 - Schedule Review of RFP language and Admin Software (171115).pdf
6M8121A03 - Caldecott Tunnel Creep Repair (180313).pdf
6M8121A04 - Fremont Line (A Line) Operability Study (180313).pdf
6M8121B01 - Design Engineering Services for Measure RR Traction Power (171207).pdf
6M8121B02 - A-Line Interlocking Track Replacement A-65 and A-75 (171219).pdf
2018
January-March
6M8121B05 - Slope Stabilization near Camino Diablo Road and MOW 12 15TC002 (190118).pdf
6M8121C01 - Program Oversight for Digital Strategy (180125).pdf
April-June
6M8121B04 - 34.5kV and Fiber Optic Replacement on C-Line from Rockridge to (180508).pdf
6M8121C.02-01 - Design Engineering Services for Measure RR Traction Power (180518).pdf
July-September
6M8121A05 - Transbay Tube Waterproofing Retrofit Design Support Services (180809).pdf
6M8121B03 - Market Street Grate Rehabilitation (180725).pdf
October-December
2019
January-March
2021
October-December
6M8121C03-01 – Concentrated Outreach to Religious Communities in SF Bay Area (211005).pdf
6M8121 B.06-02 - M87 Storage Track Extension (211227).pdf
2022
January-March
6M8121B07-03 – On-Call Support for ETAP Simulations for District Traction Power Projects - Systemwide (220323).pdf
July-September
6M8122 (PGH Wong)
2017
July-September
October-December
2018
January-March
6M8122A01 - HMC M&E Shop Improvement (180201).pdf
6M8122A02 - Design Support During Construction (180328).pdf
6M8122B02 - Value Engineering Services for Traction Power (180313).pdf
April-June
6M8122A03 - Platform Edge Doors (180404).pdf
6M8122A05 - HMC Phase 2 Track Procurement (180621).pdf
6M8122B03 - Design Services During Construction C35 Interlocking Renewal Project (180525).pdf
6M8122B09 - Conventional Portable Substation Procurement (180626).pdf
6M8122B11 - Geotech Support Services (180522).pdf
6M8122B13 - Tunnel Lighting Upgrade (180614).pdf
July-September
6M8122A07 - BART Hayward Maintenance Complex (HMC) Phase 2 Civil Grading (180814).pdf
6M8122B12 - Aerial Structure Fall Protection Design (A Line)(180802).pdf
6M8122B15 -BART A77 Interlocking Renewal Project (180925).pdf
6M8122B16 - Elevator Modernization Project (180713).pdf
6M8122C01 - TECHNICAL SUPPORT FOR BART SEA-LEVEL RISE AND FLOODING RESILIENCY STUDY(180727).pdf
October-December
6M8122A06 - Irvington Station Design (181030).pdf
6M8122A10 - HMC PHASE II - East Storage Yard - Boneyard (181030).pdf
6M8122A11 - eBART Antioch Parking Lot (181120).pdf
6M8122A12 - BART Tail Track Extension Project (181002).pdf
6M8122A19-01 - TCMP CBTC and Millbrae Tail Track Extension (191115).pdf
6M8122B14 - Station Fire Alarm System Renovation, Phase 4 (181106).pdf
6M8122B17 - BART Tailtrack Extension Project (Lafayette) Final Design (181004).pdf
6M8122B18 - MEASURE RR TRACTION POWER (181019).pdf
2019
January-March
6M8122A03-02 - PED Engineering & System Analysis (190315).pdf
6M8122B23 - ichmond Yard Track Rehabilitation Project (190326).pdf
April-June
6M8122A07-02 - BART Hayward Maintenance Complex (HMC) Phase 2 (190619).pdf
6M8122A11-02 - eBART Antioch Parking Lot (190607).pdf
6M8122A17 - Station Public Address System Improvements Project (190619).pdf
6M8122B21 - Constructability Review Support (190607).pdf
6M8122B25 - Measure RR Projects Structural Engineer Consultant (190503).pdf
July-September
6M8122A18-01 - CAD for ESP (A-Line) (190919).pdf
6M8122B01-02 - Traction Power Engineering Support (190927).pdf
6M8122B16-02 - Elevator Modernization Projet Phase 1A (190807).pdf
6M8122B27-01 - Castro Street Station Elevator Project of SFMTA (190715).pdf
October-December
6M8122A16-01 HMC - DSDC - 110-Supplement(191023).pdf
6M8122A18-02 - CAD for ESP (OKS) (191122).pdf
2020
October-December
6M8122A20-01 - PPM System Migration Support (201027).pdf
6M8122B27-01 - Resident Engineer for Trunked Radio Projects (201127).pdf
6M8122A21-01 - BART Hayward Maintenance Complex (HMC) Phase 2 Track Procurement Design Support During Construction (201215).pdf
2022
April-June
6M8122 A.06-02 -BART Warm Springs Extension Irvington Station Final Design Amendment #2 (220622).pdf
6M8123 (STV)
2017
July-September
October-December
6M8123B01 - TPSS Measure RR Project Management Design Oversight (171205).pdf
2018
January-March
6M8123B02 - Engineering Services for BART Operations Communications Systems (180313).pdf
6M8123B03 - Infrastructure State-of-Good-Repair (180313).pdf
6M8123B04 - Civic Center Station New Scissor Stairs (180130).pdf
6M8123B05 - 34.5kV Cable Replacement A-Line ANA-ACO Substations (180227).pdf
6M8123B06 - Design Engineering Services for Traction Power(180302).pdf
6M8123B09 - Sewage Pump Replacement Design (180313).pdf
6M8123B10 - RotoClone Replacement Design (180321).pdf
6M8123B11 - Facilities HVAC Equipment Replacement System Wide Final Design (180321).pdf
April-June
6M8123B07 - Design Engineering Services for Traction Power (180417).pdf
6M8123B12 - Design Engineering Services for Traction Power (180410).pdf
July-September
6M8123A01 - DSDC for Powell Street Station Modernization Project Phase 1.pdf
6M8123B05-02 - 34.5kV Cable Replacement A-Line ANA-ACO Substations (180227).pdf
6M8123B08 - M&E Corrosion Engineering Services at ORY, OCY, OBY, and OKS (180815).pdf
6M8123B17 - Fire Life Safety Engineering Support (180921).pdf
October-December
6M8123B05-03 - ASL Substation Replacement (181211).pdf
6M8123B13 - Design for Slope Rehabilitation (181204).pdf
6M8123B15 - Water Intrusion into Train Control Rooms - Phase 2 (181220).pdf
6M8123B18 - Acting Director Fire Life Safety (181002).pdf
2019
April-June
6M8123B04-02 - Civic Center Station New Scissor Stairs (190628).pdf
6M8123B10-2 - RotoClone Replacement Design (190517).pdf
July-September
October-December
6M8123B07 - 15EJ, CABLES Project Management and Design Oversight (191212).pdf
2020
January-March
6M8123B23 - Planning Engineering Services for Systems Integration Startup and (200114).pdf
April-June
6M8123B22-02 – Hayward (OHY) Truck Lift Replacement (200617).pdf
July-September
6M8123A01-02 - Continue provide as needed engineering support for architectural, structural, electrical and mechanical items during construction (201201).pdf
2021
January-March
6M8123B.25-01-TCCCP Traction Power Substations East Bay (Updated 210523).pdf
6M8123B10-03 - Additional Design Services & Extended DSDC (210317).pdf
April-June
6M8123A.02-01– Powell St Station Ceiling Improvements (210422).pdf
6M8123B.25-01-TCCCP Traction Power Substations East Bay (Updated 210523).pdf
2022
January-March
6M8123A03-01 – Market Street Entry Canopies DSDC Support (220303).pdf
6M8123B26-01 – Measure RR TPSS Project Management Support (220329).pdf
6M8123 B.02-02 -Operations Communications System Services extension (220623).pdf
July-September
6M8123 A.03-02 -Market Street Engineering Support of Structus (220701).pdf
6M8124 (WSP)
2017
July-September
6M8124A01 - TBT Pump System Upgrades DSDC (170912).pdf
6M8124A02 - Core Capacity Program Management Support (Engineering Phase)(170929).pdf
6M8124B01 - Station Service SOP Development and Implementation (170922).pdf
6M8124B02 - Capital Asset Renewal Program Support (170919).pdf
6M8124B03 - Weather Protection of Traction Power Facility Enclosure Walls (170919).pdf
6M8124B04 - M03 Interlocking Renewal DSDC (170919).pdf
6M8124B05 - Support for Train Control Engineering Division (170929).pdf
6M8124B06 - Benefit Cost Analyses (170922).pdf
6M8124B7 - Traction Power BFS Updates and Design Workshops (1710926).pdf
October-December
6M8124A03 - 24th Street Break Room DSDC (171010).pdf
6M8124A04 - Iron Horse Trail Final Design (171130).pdf
6M8124B08 - 34.5 kV Cable Replacement and Fiber Optic Cable Installations (171005).pdf
6M8124B10 - Measure RR TP-010 Traction Power Facility Replacements (171102).pdf
6M8124B11 - Geotechnical Engineering Oversight Peer Review (171101).pdf
6M8124B12 - Traction Power Preventative Maintenance (171128).pdf
6M8124B13 - Track Department Engineering Support (171220).pdf
2018
January-March
6M8124A05 SFTS MB DSDC (180103).pdf
6M8124B14 - Berkeley Hills Tunnels Lining Surface Treatment DSDC (180104).pdf
April-June
6M8124A03-02 - 24th Street Break Room Additional DSDC (180529).pdf
6M8124A05-02 - Continued SFTS MB DSDC (180529).pdf
6M8124A6 - El Cerrito del Norte Station Design Services during (180515).pdf
6M8124B08-02 - 34.5 kV Cable Replacement and Fiber Optic (180529).pdf
6M8124B9 - MMS and MCC TPSS Final Design and Bid Support (180410).pdf
6M8124B15 - Transbay Tube (TBT) Tunnel Lighting Upgrade (180601).pdf
July-September
6M8124B08-3 - 34.5 kV Cable and Fiber Optic Cable Installation along the A and R Lines (180821).pdf
October-December
6M8124B08-4 - Detailed Table of Routes and IDS Updates (181023).pdf
2019
January-March
6M8124B20 - Acting Director FireLife Safety PDC, (190308).pdf
6M8124B20 - Acting Director FireLife Safety PDC, (190308).pdf
6M8124B21 - Fire Life Safety Engineering Support (190308).pdf
April-June
6M8124A7 - Balboa Park Station Modernization Phase 2 - DSDC (190607).pdf
6M8124B14-02 - Berkeley Hills Tunnels Lining Surface Treatment DSDC -Continued DSDC (190614).pdf
October-December
6M8124B08-5 - A&R Line 34.5kv Cable Replacement Post 100% Design Add'l Scope (191213).pdf
2021
January-March
6M8124B11 - Amendment – Geotechnical Engineering Oversight Reviews (210223).pdf
6M8132 (ACm)
2018
October-December
6M8132B11-01 Rev 1 - Prototyping and Design (210226).pdf
2019
January-March
6M8132A05 - Design Support Coordination HMC (190207).pdf
6M8132B01 - 34.5kV design support (190124).pdf
6M8132B02 - M Line 34.5 kV Cable Replacement {MBP to MTW) DSDC Services (190227).pdf
April-June
6M8132A04 - Core Capacity Quality Assurance Manager (190521).pdf
6M8132B06 - M-Line Tunnel Lighting Upgrade - Assistant RE Services (190628).pdf
July-September
6M8132A02 - Berkeley Plaza Improvement - Phase 5 (190723).pdf
6M8132A03 - Fire Protection Support Services (190925).pdf
6M8132A06 - Train Control Modernization Program - Engineering & DSDC (190919).pdf
6M8132A08 - Safety Barrier in ROW Systemwide Phase 3 (190807).pdf
6M8132A08 - Construction Coordination for HMC Phase 2 PE (190924).pdf
6M8132 A10-01- DSDC for 15LK-120A Market Street Escalators Renovation (190816).pdf
6M8132A11-01 Market Street Canopies 15LK140 DSDC (190911).pdf
October-December
6M8132B03-01 34kV Structural Support - Structural Engineers-2018-2019 (191025).pdf
6M8132B10 - Measure RR TCCP Traction Power Facllilies (191231).pdf
6M8132B13 - Resident Engineering for the A65 75 interlocking renewal project (191217).pdf
6M8132B14 - 34.5 kV AC Cable Reolacement and FO Cables - A-Line (191112).pdf
6M8132A04-02 Core Capacity Senior Quality Officers(191028).pdf
2020
January-March
6M8132A07 - Provide Office Engineering (200107).pdf
6M8132A12-01 - HMC DSDC and Support Services (200128).pdf
6M8132A12-03 - HMC DSDC and Support Services (200117).pdf
6M8132A13 - Office Engineering Support for TCMP (200311).pdf
6M8132B04-01 – Oakland Emergency Generator (200323).pdf
April-June
6M8132B15-01 – Inspector of Fire Alarm System Replacement, Phase 2 (200414).pdf
6M8132B19-01 – ASL-KTE-CWS Substations Testing (200428).pdf
6M8132A02-02 – Berkeley Plaza Improvement – Phase 6 (200428).pdf
6M8132A09-01 – SVBX Testing & Coordination Support (200428).pdf
6M8132B17-01 – ASL Substation Replacement (200520).pdf
July-September
6M8132B08-02 – Safety Barrier in ROW Systemwide Phase 3 (200821).pdf
6M8132B01-02 – K and M - Line 34.5KV Cable Upgrade DSDC Services (200824).pdf
6M8132B02-02 – M Line 34.5 kV Cable Replacement Additional Tasks (200824).pdf
6M8132B17-02 - Traction Power Engineering Inspection Services (201120).pdf
6M8132B08-03 Rev 1 - Safety Barrier in ROW Systemwide - Phase Continuation and Closeout (201204).pdf
October-December
6M8132B16-01 – OKS Vacuum System Replacement (200923).pdf
6M8132B12-01 - Provide PT Office Engineering and FT Inspection for replacement work (201026).pdf
6M8132B20-01 Rev 3 – 34.5 kV Cable Project Replacement, K & C-Lines – Construction Support (200924).pdf
6M8132B21-01 Systemwide HVAC Upgrades - Additional Design and DSDC (201125).pdf
2021
January-March
6M8132B07-02 PROVIDES DESIGN FOR CRACK REPAIR AND MONITOR FIELD INSTALLATION (210322).pdf
April-June
6M8132A13-02 CBTC Enabling Work Construction Contract Office Engineer (210414).pdf
6M8132B14-02– 34.5 kV AC Cable Replacement (260421).pdf
6M8132B16-02– OKS Vacuum System Replacement (260421).pdf
6M8132B18-02–Dust Collectors Replacement Project Extension (260421).pdf
July-September
6M8132B12-02 – Replacement of Halon FACP at LMA (210818).pdf
6M8132A03-02 – Fire Protection Support Services Supplement (210910).pdf
October-December
6M8132B08-04 – Safety Barriers Maintenance Way - Extension (211006).pdf
6M8132B24-01 – CWS Transformer Replacement - Design Support - Communication Engineering (211011).pdf
2022
January-March
6M8132B15-03 – Fire Alarm System Replacement Phase 2 - Extension (220126).pdf
6M8132B18-03 – Richmond-Concord-Hayward Dust Collector Replacement - Extension (220216).pdf
6M8132B24-02 – Willow Pass CWS Transformer Replacement – Construction and Testing (220328).pdf
April-June
6M8132B22-02 – Richmond Yard Fence - Extension (220407).pdf
6M8132 B.08-05 - Safety Barrier Maintenance Way (220517).pdf
July-September
6M8132 A.13-03 - CBTC Enabling Work Construction Contract Office Engineer (220803).pdf
October-December
6M8132B15-04 Fire Alarm System Replacement Phase 2 - Extension (221028).pdf
6M8132B21-02 Systemwide HVAC Replacement - Extension of DSDC (221118).pdf
6M8132B22-03 Richmond Yard Fence - Extension (221128).pdf
6M8132B18-04 Richmond-Concord-Hayward Dust Collector Replacement - Extension (221213).pdf
6M8132B25-01 Fire Alarm Replacement - Phase 3 - Resident Engineer (221229).pdf
2023
January-March
6M8132B15-05 Fire Alarm System Replacement Phase 2 - Extension (230223).pdf
April-June
6M8132 A13-04 CM Support for Enabling Works Construction Project 49GH006 (230531).pdf
July-September
6M8132 B14-03 34.5 kV Cable Replacement - A Line (CM Extension) (230928)
6M8132 B24-03 CWS Transformer Replacement - Construction and Testing (230928)
2024
January-March
6M8132 A.13-05 CM Support -OE - for Enabling Works Construction Project 49GH005 49GH006 (240125).pdf
6M8132 B.26-01 Communication Engineering services for multiple substation projects (240227).pdf
6M8133 (Ghirardelli)
2018
October-December
2019
January-March
6M8133A01 - Scheduling Support - Various (190102) (updated 2021-12-07).pdf
6M8133A02 - Provide scheduling and risk mitigation support (190109).pdf
6M8133A03 - Construction Administration, Inspection, QA Testing (190213).pdf
6M8133A04 - El Cerrito del Norte Station Modernization CM Staff (190220).pdf
6M8133B02 - Track Geometry Car Procurement RE and Scheduler (190102).pdf
6M8133B04 - Traction Power Substation ASL Installation (190326).pdf
6M8133B05 - Oakland Emergency Generator Replacement CM (190326).pdf
6M8133B06 - Provide CM services for the pothole repair project (190226).pdf
6M8133B08-01 - Provide technical support for various traction power projects (190118).pdf
6M8133B09 - Provide support staff for Track Interlocking Replacement (190315).pdf
6M8133B.11-01 - Measure RR Bond Project and Program Support 2018-2019 - OE (190405).pdf
6M8133B09 - Provide support staff for Track Interlocking Replacement (190315).pdf
April-June
6M8133A05 - Construction Management Services for Transit Operations Facility (190514).pdf
6M8133B06-02 - Provide CM services for the pothole repair project (190614).pdf
6M8133B09 - Provide support staff for Track Interlocking Replacement (190315).pdf
July-September
6M8133A04-02 – CM Services for El Cerrito Del Norte Station Modernization Project (190919).pdf
October - December
6M8133A04-02 – CM Services for El Cerrito Del Norte Station Modernization Project (190919).pdf
6M8133B11-02 - CONTINUATION - Office Engineer Administrative Services for CM Support (191213).pdf
6M8133B13-01 – TBT CP Anode Sled and Cable Replacement (191105).pdf
6M8133B12-01 – 34.5 kV AC Cable Replacement Inspection Services – M-Line (191107).pdf
2020
January-March
6M8133A07 - CM services for trackwork procurement for HMC (200204).pdf
6M8133B04-02 - Provide CM services for the Traction Power Substation (200304).pdf
6M8133B16 - Provide constructability support for Switch Power (200128).pdf
6M8133B17 - Provide CM and inspection services for the Millbrae Station (20304).pdf
6M8133A08-01 – CM Services for HMC Phase 2 Civil Grading Contract (200207).pdf
6M8133B14-01 – TP-10 Substation Replacements (200318).pdf
6M8133A04-03 – El Cerrito del Norte Station Modernization CM Services (200508).pdf
April-June
6M8133B10-01 – Civic Center Station Scissor Stairs (200408).pdf
6M8133B18-01 – Safety Specialist Services (200427).pdf
6M8133A04-03 – El Cerrito del Norte Station Modernization CM Services (200508).pdf
6M8133B15-01 – Daly City Yard and Civic Center Station HVAC Upgrades (200508).pdf
6M8133B09-02 – Track and Systems Support (200528).pdf
6M8133B05-02 – Oakland Emergency Generator System (200901).pdf
July-September
6M8133B03-02 – 15EK Traction Power Substation Procurement CM (200727).pdf
6M8133B13-02 – TBT CP Anode Sled and Cable Replacement (200819).pdf
6M8133A03-02 – Construction Management Services for eBART Antioch Station Parking Lot (200901).pdf
6M8133B.16-02 – Switch Power Infrastructure Constructability (200921).pdf
6M8133B.13-03 – TBT CP Anode Sled and Cable Replacement (200923).pdf
6M8133B.20-01 – Site Improvements at Lafayette Station Claims Support (200921).pdf
6M8133B.19-01 – TCCCP New Traction Power Facilities West Bay Project (201127).pdf
October-December
6M8133B.08-02 – Traction Power Projects (201103).pdf
6M8133B.10-02 – Provide CM team for the construction of the Civic Center Station Scissor Stairs Project (210308).pdf
2021
January-March
6M8133A.03-03 – Construction Management Services for eBART Antioch Station Parking Lot (210216).pdf
6M8133A04-04-CNMGT El Cerrito Del Norte Station Modernization Project (210521).pdf
2022
October-December
6M8133B10-04 Civic Center Station Scissor Stairs Project - Extension (221121).pdf
2023
April-June
6M8133 B10-05 Civic Center Station Scissor Stairs Project - Extension (230609).pdf
October-December
6M8133 B10-06 Civic Center Station Scissor Stairs Project (Close-Out) (231116)
6M8134 (HDR)
2018
October-December
6M8134A01 - TBT Internal Retrofit (181213).pdf
6M8134B02 - PROFESSIONAL ENGINEER (STRUCTURE) TO SUPPORT R&R PROGRAM (181221).pdf
6M8134A02-01 - SVBX Phase 3 Train Control Testing Support (181227).pdf
2019
January-March
6M8134A03 - El Cerrito Del Norte Station Modernization (190220).pdf
6M8134A4 - Market Street Escalators (190326).pdf
6M8134B01 - M-Line Tunnel Lighting Upgrade (190326).pdf
6M8134B05 - Safety Barrier Phase 3 Utility Investigation (190220).pdf
6M8134B09 - Civil Structures Bond Measure Project (190228).pdf
6M8134B11 - TBT Cross Passage Doors Replacement (190326).pdf
April-June
6M8134A05 - El Cerrito Del Norte Cost Estimation Support (190607).pdf
6M8134A6 - El Cerrito Del Norte Electrical Inspection (190607).pdf
July-September
6M8134B14 - Aerial Structure Fall Protection Project (190719).pdf
6M8134A02-02 - SVBX Phase 3 TC Testing Support (190920).pdf
6M8134A07.01 – CNMGT(6months)- HDR - El Cerrito Del Norte Station Modernization Project(190827).pdf
6M8134A09 - Embarcadero and Civic Center Bike Station Modifications (190924).pdf
6M8134B03 - M-Line Tunnel Lighting Upgrade (190927).pdf
6M8134B03 - M-Line Tunnel Lighting Upgrade - Updated (200828).pdf
October-December
6M8134B13-01 – Support to SVBX Traction Power & Electrical Systems (191002).pdf
6M8134A08-01 CNMGT - Network Engineer - El Cerrito Project(191008).pdf
6M8134A11-01 ADA Management Support (191107).pdf
2020
January-March
6M8134A02-03 - SVBX Phase 3 TC Testing Support (200114).pdf
6M8134A0-02 - Construction Management, Inspection, and Cost Estimation Support (200117).pdf
April-June
6M8134A12-01 – Walnut Creek Station Modernization (200406).pdf
July-September
6M8134A07-03 – El Cerrito Del Norte Station Modernization (200805).pdf
6M8134B16-01 – M-Line Tunnel Lighting Upgrade - RE&OE (200810).pdf
6M8134B13-02 - Engineering Services 34.5kv System Wide Blocking Scheme (200921) Updated.doc.pdf
2021
January-March
6M8134 B17-01 Train Control Room Battery Replacement (210216) (Rev 231127).pdf (bart.gov)
July-September
6M8134B09-02 – Civil Structures Bond Measure Project (ARE) (210713).pdf
6M8134B.18-01- Measure RR Traction Power Engineering Support (8.26.21).pdf
2022
January-March
6M8134B06 - Construction Management Electrical Inspection (191213) (updated 220316).pdf
July-September
October-December
6M8413A04-03 Core Capacity Program - Risk Manager (221102).pdf
6M8134 B.06-02 Station Emergency Lighting (221202)(Rev231222).pdf (bart.gov)
2023
January-March
6M8134 B1802 New substation KTE, MCC and MMS testing and commissioning (230303).pdf
July-September
6M8134 B19.01 Fire Alarm Replacement - Phase 3 - Inspector(s), Scheduler (230706)(Rev240412).pdf
6M8134 B.19-02 Fire Alarm Replacement - Phase 3 - Extension (240807).pdf
6M8135 (Jacobs)
2018
October-December
2019
January-March
6M8135A01 - BART Earthquake Safety Program - Transbay Tube Seismic Retrofit (190326).pdf
6M8135A05 - field engineering support for the SVBX Project (190227).pdf
6M8135B02 - Escalator Reliability Improvement - O&K Escalator (190207).pdf
6M8135B07 - M&E Project Coordination Support (190227).pdf
April-June
6M8135A05-02 - field engineering support for the SVBX Project (190607).pdf
6M8135A06 - Union City Station Phase 2A (190628).pdf
6M8135B01 -CM Support for Bond Measure Track Projects (190521).pdf
6M8135B04 - Track Geometry Car (190625).pdf
6M8135B06 - Procurement of Train Control Room MUX (190508).pdf
6M8135B09 -Various Projects (190531).pdf
July-September
6M8135A04-02 - Wayfinding Improvements Project Phase III (190723).pdf
6M8135B13-01 – Measure RR Program Support (190731).pdf
6M8135B14 - Track Geometry Car Procurement Replacement Project (190808).pdf
6M8135B02-2 – O&K Escalator Controller Replacement & Limited(190822).pdf
October-December
2020
January-March
6M8135A05-03 - field engineering support for the SVBX Project (200303).pdf
6M8135B10 -Negative Return Mapping (200212).pdf
6M8135A07-02 – Train Control Modernization Program (200402).pdf
March-June
6M8135A03-01 – Construction Services – PD & C (200902).pdf
April-June
6M8135A03-02 – TBT Internal Retrofit – CM Services (200409).pdf
6M8135B09-02 – Office Engineering & Project Coordinator Services - CM (211205).pdf
July-September
6M8135B02-03 – Escalator Reliability Improvement - O&K Escalator (200702).pdf
6M8135A04-03 – Wayfinding Improvements Project Phase III (200729).pdf
6M8135A07-03 – Project Management Support (201030).pdf
2021
January-March
6M8135A03-03 – TBT Internal Retrofit - Construction Management Services (210202) Updated.pdf
6M8135A09-01– HMC2 - Civil Grading Project (210331).pdf
April-June
6M8135B.12-01 Noise Measuring and Corr Tracker Development (210414).pdf
6M8135A.06-02 01VM-120 Union City Intermodal Station Phase 2A (210421).pdf
July-September
6M8135A02-02 Wayfinding Improvements Phase 2 (210805).pdf
6M8135A04-04 Wayfinding Improvements Project Phase III (210823).pdf
2022
January-March
6M8135B14-03 – Track Geometry Car - Extension (RE) (220304).pdf
October-December
6M8135B14-04 Track Geometry Car Procurement - RE (Extension) (221214).pdf
2023
January-March
April-June
July-September
6M8135 B.01-02 Program Project Management and Controls (240807).pdf
6M8136 (Parsons)
2019
January-March
6M8136A01 - Transbay Tube Waterproofing Retrofit Design Support Services (190115).pdf
6M8136A02 -Design Procedure - Design Deliverable Checklist (190329).pdf
6M8136B02 - OCY Wheel Truing Facility (190326).pdf
April-June
6M8136A03 - TCMP Enabling Works Support (190503).pdf
6M8136C01 - Workday Campus Connectivity and Joint Police Services Center (190412).pdf
July-September
6M8136B03-01 - Production Rail Profiling Service Support (190730).pdf
6M8136C02-02 BART Certification Support(190903).pdf
6M8136B04-01 Rail Grinder Repair and Upgrade Servicing(190904).pdf
2020
January-March
6M8136B07-01 – KTE and TP CM Support (200318).pdf
April-June
6M8136B06-01 – CWS High Voltage Transformer Replacement Project (200508) (updated 220315).pdf
6M8136A04-01 – Market Street Canopies Bid Support and DSDC (200617).pdf
6M8136B08-01 – Construction Support Services for MUNI Powell Street Elevator (200526).pdf
July-September
6M8136A05-01 – Dublin-Pleasanton Parking Lot Reconfiguration CM Support (200723).pdf
6M8136A03-02 – TCMP Support (200729).pdf
6M8136B05-01 – TCCCP New Traction Power Facilities West Bay Project v5 (201120).pdf
October-December
2021
January-March
6M8136A07-01 – Parking Feasibility Analysis and Outreach & Engagement (210107)_1 (1).pdf
6M8136A02-02 – Design Scoping Document Support (210209).pdf
April-June
6M8136B06-02 – CWS High Voltage Transformer Replacement-RE (210423) (updated 220315).pdf
July-September
6M8136B03-02 – Production Rail Profiling Services - Extension (210712).pdf
6M8136B04-02 – Rail Grinding Cars Service Supports (210721).pdf
6M8136B09-01 – Construction Management Personnel for BART Projects (210721).pdf
6M8136B10-01 – QA and Special Inspections for 34.5kV Cable Projects (210927).pdf
October-December
6M8136 B05-02 – TCCCP New Traction Power Facilities West Bay - Extension (211101) (Rev 231109).pdf
6M8136 B09-02 Assistant Resident Engineer Support for Civil and Structures Program (221229).pdf
2022
July-September
6M8136 B.03-03 - Rail Profiling Services Support Supplemental (220803).pdf
6M8136B06-03 CWS High Voltage Transformer Replacement-RE, OE, Insp (220921).pdf
October-December
6M8136 B04-03 Rail Grinder Repairs and Upgrades - Extension (221228).pdf
6M8136 B06-04 CWS High Voltage Transformer Replacement (221228).pdf
2023
April-June
6M8136 B10-02 QA and Special Inspections for 34.5kV Cable Projects (230511).pdf
October-December
6M8136 B05-03 TCCCP New Traction Power Facilities West Bay Project - CM Extension (231010).pdf
6M8136 B09-03 Assistant Resident Engineer Support for Civil Projects (231115)
2024
January-March
6M8136 B11-01 KTE Substation - CM Extension (240125).pdf (bart.gov)
6M8137 (PGH Wong)
2018
October-December
6M8137B01 - Construction Coordination Cell (181109).pdf
2019
January-March
6M8137A03 - CM Services for the Powell Street Ceiling and Lighting project (190219).pdf
6M8137A04 - Station Access Improvements Projects (190221).pdf
6M8137B03 - Documentation and Configuration Control (190319).pdf
April-June
6M8137A05 - TCMP Communication Based Train Control (190503).pdf
6M8137B04 - Preconstruction Program Support Services (190607).pdf
July-September
6M8137A06-01 - CM Support for Sustainability Projects (190703).pdf
6M8137A07 - TCMP Enabling Works (190919).pdf
6M8137B05 -TPSS Replacement - ASL Installation CM-RE (190807).pdf
October-December
6M8137B06-01 Oakland Emergency Generator (OEG) System RE, ARE and Inspector(191007).pdf
6M8137B07 - QA Inspection for K-Line 34.5kV Cable Replacment Project (191213).pdf
6M8137B09-01 HVAC Upgrades for Train Control Sites (191105).pdf
6M8137B.09-01 HVAC Upgrades for Train Control Sites (191105) Revised (201013).pdf
6M8137B08-01 Sewage Pump Replacement Project - RE, OE, Inspector, Scheduler (191105).pdf
2020
January-March
6M8137A08 - Construction Management Services (200107).pdf
6M8137A09 - Advertising Franchise Digital Ad Screens - Field Inspectors (200225).pdf
6M8137A10 - Office Engineer for Core Capacity Program Projects (200311).pdf
6M8137B10-01 – Pleasant Hill Parking Structure Elevator Modernization Project (200320).pdf
April-June
6M8137B05-02 – Traction Power Substation Replacement (200415).pdf
6M8137B04-02 – Operating & Capital Programs - RR Earned Value Management Support (200427).pdf
6M8137B11-01 – KTE Substation Project (200520).pdf
6M8137A.06 - Systemwide Historical Assessment (201214).pdf
July-September
6M8137B12-01 – W-LINE TUNNEL WATER MITIGATION - INSPECTIONS (200713).pdf
6M8137B04-03 – Non-RR Earned Value Management Support (200723).pdf
6M8137B10-02 – Pleasant Hill Parking Structure Elevator Modernization Project (200819).pdf
6M8137B.06-02 Oakland Emergency Generator Project (201022) Updated.pdf
October-December
6M8137B01-02-Construction Management(Revised 240621).pdf
6M8137A.04-04 BART ART INTEGRATION (201016).pdf
6M8137B.05-03 Traction Power Substation Replacement ASL Installation Contract (201120).pdf
6M8137A.05 - Stakeholder Listening Sessions - Policing Alternatives (201127).pdf
6M8137B.12-02 - W-Line Tunnel Water Proofing - Inspection Services (210108) Updated.pdf
6M8137A.04-02 - (Rev. 1) Station Access Improvements Project Support (21020211).pdf
2021
July-September
6M8137A09-02 – Ad Franchise Technical and Project Management Support (210916).pdf
2022
January-March
6M8137A06-02 – Retrofit Parking Garage Lighting (220321).pdf
April-June
6M8137A11-01 – CBTC Contracts Management & Deployment Manager Gap Fill (220401).pdf
6M8137 A.08-02 - Wong CMS FY 2022 & FY 2023 (220418).pdf
6M8137 A.12-01 - TCMP Enabling Works 49GH006 Material Support & Asst RE Gap Fill (220418).pdf
6M8150 (Prescience)
2018
October-December
6M8150A01 - Design Services During Construction Services for (181130).pdf
6M8150B03 - Friction Modifier Investigation (181214).pdf
6M8150A02 - Silicon Valley San Jose Extension Tunneling and Station Design Study (181227).pdf
2019
January-March
6M8150A03 - Inter Agency Facilitation Supports (190329).pdf
6M8150B01 - Design Support & DSDC - 09EK300 Oakland Emergency Generator (190226).pdf
6M8150B05 - Measure RR Material Management Services (190222).pdf
April-June
6M8150A04 -CM Support Services for El Cerritos Del Norte Modernization Project (190419).pdf
6M8150A5 -Vertical Transportation Support for Station Projects (190619).pdf
6M8150B06 - Construction Management Services for Measure RR Track Projects (190514).pdf
6M8150B07 - CM Services for Coverboard Enhancement Projects (190517).pdf
6M8150B.8 - Structure Inspection Services (190409).pdf
6M8150B09 - Management Services Support to Train Control Engineering Division (190621).pdf
6M8150B10 -BFS Structures Technical Specification Review (190514).pdf
July-September
6M8150A07 - Embarcadero Station Platform Elevator Capacity and Redundancy Project (190730).pdf
6M8150A6 – CM Services for Powell St. Station Modernization Project (190816).pdf
6M8150B11 - M Line 34.5 kV Cable Replacement Project (190927).pdf
6M8150.A.09.1 BART to Silicon Valley Extension‐Phase II (BSV II)‐ Project No. 02HB000 (201020).pdf
October-December
6M8150A04 -CM Support Services for El Cerritos Del Norte Modernization Project (191122).pdf
6M8150.B.12.1 Capital Asset Renewal Program Reporting Support (201019) Updated.pdf
6M8150B12 Capital Asset Renewal Program Reporting Support(191014) Revised (201013).pdf
2020
January-March
6M8150B02 - Track Geometry Car Consulting (200114).pdf
6M8150B11-01 – 34.5 kV AC Cable Replacement [M‐Line] RE Services (200318).pdf
6M8150B10-01 – Update of BFS Structures Technical Specification Review (200330).pdf
April-June
6M8150B14-01 – Safety Specialist Services for Capital Loading Projects (200427).pdf
6M8150B13 – OKS Geometry Vehicle Storage & Spur Track (200514).pdf
July-September
6M8150B15-01 – CR of Swing Door Style ADA Faregate (200714).pdf
6M8150.B.11.2 Provide CM Services for M Line 34.5kV Cable Replacement (201020).pdf
6M8150B.06.1 Rev 2 – Provide CM Services for Bond Measure Track Projects (200924).pdf
6M8150.A.04.02 - CM Supports for El Cerritos Del Norte Station Modernization (201201).pdf
October-December
6M8150B.17 – Renew Soundwalls Guideway - Assessment of Acoustic Panel Fasteners (200902).pdf
6M8150.B.08.1 Continuation eBART Annual Routine Inspection (2020 & 2021) (201016).pdf
6M8150.B.12.1 Capital Asset Renewal Program Reporting Support (201019) Updated.pdf
2021
January-March
6M8150.A.10 - Program Management Support Administration Services (210302).pdf
April-June
6M8150.B.18 - Subject Matter Expert Services of Automated Fare Gates (201209).pdf
October-December
6M8150B13-01 – OKS Geometry Vehicle Storage & Spur Track Project (211129).pdf
6M8150B02-02 – Track Geometry Car Procurement - Extension (211129).pdf
6M8150B12-01 – Capital Asset Renewal Reporting Support (211221).pdf
2022
January-March
6M8150B11-03 – 34.5 kV Cable Replacement M-Line Extension (220328).pdf
April-June
6M8150A8.1 - HMC2_ESY_Constructability Review (220622).pdf
2023
July-September
6M8150 B19-01 Scheduling Support for Capital Projects (230810)
October-December
6M8150 B20-1 Soundwall Repair - Assessment of Acoustic Panel Fasteners (231113)
2024
January-March
6M8150 B.21-01Track and Structures Planner Services for PM Planning & Scheduling Group (240221).pdf
6M8151 (TAG/Vali Cooper)
2018
October-December
2019
January-March
6M8151A02 - Hayward Maintenance Complex (190220).pdf
6M8151A03 - Fruitvale Station and Coliseum Station (190501).pdf
6M8151B01 - Pleasant Hill Parking Structure Elevator Modernization (190326).pdf
April-June
6M8151A04 - Support for Deputy General Manager - Various Projects (190514).pdf
6M8151B03 - Hayward Yard Gas Line Replacement (19628).pdf
July-September
6M8151A02-02 - Construction Management Services for Project 01RQ-110 & 120 (190807).pdf
6M8151A0501-Construction Management Services for Project 01RQ-150 (190816).pdf
6M8151A08 - Hayward Maintenance Complex Central Warehouse (190925).pdf
6M8151B01-02 Pleasant Hill Parking Structure Elevator Modernization-RE Continued(190911).pdf
6M8151B.02-03 – Construction Management Services for Project 54RR-250 (201127).pdf
6M8151B.02-03 – Provide Resident Engineer and Office Engineer Services for the Concord Yard Fire Protection Project No. 54RR-250 (201127).pdf
October-December
6M8151A06 - Construction Management Services (191115).pdf
6M8151A07-00 19th St Station Mod - CM Services(191028).pdf
6M8151A09 - Construction Management Services for Project 15HB - 120 (191217).pdf
6M8151B06 – Construction Management Services for Project 54RR-270 (191105).pdf
6M8151B02-02 Resident Engineer and Office Engineer Services (191105).pdf
2020
January-March
6M8151A10-01 – HMC Phase 2 - Community Relations Support (200318).pdf
April-June
6M8151A05-02 – Hayward Maintenance Complex Central Warehouse (CM Services) (200414).pdf
6M8151A03-02 – Construction Management Services for the Earthquake Safety Program (200512).pdf
July-September
6M8151B05-01 –35.4kV AC Cable Replacement and Fiber Optic Cables Installation R-Line (200818).pdf
6M8151A.11-01 – Project & Construction Management Services for 2150 Webster St. (200902).pdf
6M8151A.02-04 – Construction Management Services for Project 01RQ-110 (200921).pdf
6M8151A05-03-HMC150 (Updated 210503).pdf
2021
January-March
6M8151B.07 – Construction Management Services for Project 15DT00315TD000 (210222).pdf
6M8151A11-02 – Task Project & Construction Management Services (210330).pdf
April-June
6M8151A.02-05 Construction Management to Support for HMC (210421).pdf
6M8151B.02-04– Concord Yard Fire Protection Extension (260421).pdf
6M8151B.06-02– Richmond Yard Fire Protection (260421).pdf
6M8151A05-04-Construction Management to Support for HMC(190521).pdf
6M8151A11-02REVISED- Construction Management to Support for BHQ(240521).pdf
2022
January-March
6M8151B06-03 – Richmond Yard Fire Protection - Extension (220201).pdf
October-December
6M8151B.05-02 34.5 kV Cable Replacement - R-Line (CM Team Extension) (221028).pdf
6M8142 (AECOM)
2019
April-June
6M8142B01 - Computer Systems Engineering (190423).pdf
6M8142B04 - Signal Aspect Installation Structural Analysis (190521).pdf
6M8142B05 -Traction Power Technical Studies (190529).pdf
6M8142B09 - Traction Power Transformer Design (190628).pdf
6M8142C01-01 - San Bruno Site Remediation (190408).pdf
July-September
6M8142A01 - Design Services During Construction and Project Closeout (190927).pdf
6M8142A04-01 - Transit Operations Facility - Risk Assessment (190730).pdf
6M8142B11 - Embankment Erosion Mitigation (190807).pdf
6M8142B06-01 Acoustic Panel Connection Fastener Verification (190904).pdf
6M8142B12 - Train Control Rooms Water Intrusion (190924).pdf
6M8142B15-01 Train Control Support Services (190909).pdf
6M8142B03-01 – Oakland Emergency Generator DSDC (190917).pdf
6M8142B10-01 – Measure RR TP Substation Replacement TP10 & TP11 (190930).pdf
October-December
6M8142B14 - BART Facility Standards Systems Update (191203).pdf
6M8142B16-01 – 34.5 KV Blocking System Phase II (191001.pdf
6M8142B17 - Asset Management Data and Modeling Support (191203).pdf
6M8142B18 - Computer Systems Engineering Design Support Services (191112).pdf
6M8142B07-01 34.5 kV Structural Support-Structural Engineers-2019-2020(191025).pdf
2020
January-March
6M8142A05 - Transit Operations Facility Environmental Clearance and Design (200114).pdf
6M8142B08-01 – Water Intrusion in Escalator and Elevator Machine Rooms (200219).pdf
April-June
6M8142B19-01 – M&E – Substation Walls Paint Sampling (200427).pdf
6M8142B10-02 – Measure RR TP Substation Replacement – CER & Final Design (200427).pdf
6M8142A06-01 – Lake Merritt Plaza Design Services (200512).pdf
July-September
6M8142B09-02 – CWS High Voltage Substation Transformer Replacement (200819).pdf
6M8142 Work Plan No. A.02-02 – Additional Design Services During Construction (201201).pdf
6M8142B.15-02- Wayside MUX Line Replacement Unit (updated 030521.pdf
2021
January-March
6M8142 Work Plan No. B.12-03 – Train Control Rooms Water Intrusion (201109).pdf
6M8142 Work Plan No. B.12-04 – Train Control Rooms Water Intrusion (210125).pdf
6M8142 Work Plan No. B.11-02 – Embankment Erosion Mitigation (210318).pdf
April-June
6M8142A.09-01–TBT Internal Retrofit Seismic Re-Analyses-Slope movement (210422).pdf
6M8142B.16-02– 34.5 kV Blocking Scheme – Phase II Project (260421).pdf
6M8142 Work Plan No. B.15-04 – Train Control Support Serivces (2103116).pdf
6M8142B21-01-Environmental Studies for Fence Replacement Locations (100521).pdf
6M8142B23-01-M87 Storage Spur Track Extension Environmental Support (200521).pdf
6M8124B11-02-Peer Review Services (210621).pdf
July-September
6M8142B11-03 – Embankment Erosion Mitigation (210802).pdf
6M8142B.09-03-CWS High Voltage Transformer Replacement Project (8.26.21).pdf
6M8142A10-01 – Irvington Station Independent Peer Review (210923).pdf
October-December
6M8133B09 - Provide support staff for Track Interlocking Replacement (190315).pdf
6M8142A09-02 – Additional Longitudinal Analyses in Zone 3 and 3D Analyses in Zone 5-6 (211202).pdf
6M8142B24-01 – Storm Water Quality Support Services (211210).pdf
6M8142B11-04 – Systemwide Slope Stabilization Project (211214).pdf
6M8142B15-03 – Train Control Support Services (211224).pdf
2022
January-March
6M8142A14-01 - WSX Environmental Mitigation Support Services (220103) - Revised ii.pdf
6M8142A15-01 – Market Street Escalator Renovation Project DSDC (220207).pdf
6M8142B22-01 – Steel Bridge Fracture Critical Member Inspection (220214).pdf
6M8142B31-01 – Assess and Repair Washington Ave Steel Bridge in San Leandro (220216).pdf
6M8142B30-01 – Project Management Support Services (220225).pdf
April-June
6M8142B07-03 – 34.5 kV Structural Support-Structural Engineers (220401).pdf
6M8142B35-01 – PPMS- Phase 2 Technical Liaison Services (220407).pdf
6M8142 B.28-01 - A-Line, S-Line and W-Line (220426).pdf
6M8142 B.26-02 - Engineering Design Quality Support (Phase 2 & 3) (220518).pdf
October-December
6M8142B09-04 CWS High Voltage Transformer Replacement Project - Design Support (221007).pdf
6M8142 B33-01 15TC010 M-Line Tunnel Design Services (221229).pdf
2023
January-March
6M8142 B15-04 Wayside MUX LRU - Phase 2 - Procurement of Prototypes - Support (230117).pdf
6M8142 B34-01 Quality Audits Support of BART Capital Engineering Projects (230217).pdf
6M8142 A02-03 01RQ-150 CAD Record Drawings for the Central Warehouse (230228).pdf
April-June
6M8142 B23-02 M87 Storage Track Extension Additional Environment Support (230424).pdf
July-September
6M8142 B39-01 Silicon Valley Berryessa Extension Embankment Seismic Assessment Peer Review (230928)
October-December
2024
January-March
6M8142 B.57-01 15CQ008 & 15CQ020 Traction Power Engineering & Construction Support (240212).pdf
6M8142 B.33-02 Bid Support and DSDC for M-line tunnel water intrusion repair (240304).pdf
6M8142 B.023-03 M87 Spur Track Extension Environmental Support (240304).pdf
6M8142 B.56-01 PM Support for Mechanical, Train Control and Communication (240314).pdf
6M8142 B.55-01 PPMs and Programmatic Support (240329).pdf
April-June
6M8142 B.63-01 Electrical Engineering and Design Support (240412)_0.pdf
6M8142 B.62-01 Project Management Support for Elevator Projects (240415).pdf
6M8142 B.15-05 Wayside MUX (WSMUX) BQ1 Boards – Support (240607).pdf
6M8142 B.65-01 System Access and Resource Forecasting Analyst Support (240610).pdf
6M8142 B.54-01 Quality Assurance Support of BART Capital Projects (240610).pdf
July-September
6M8142 B.20-02 Design Support for Reroofing Project (240719).pdf
October-December
6M8142 B.56-02 Cathodic Protection & Traction Power Project Management Support (241029).pdf
6M8143 (HDR)
2019
April-June
July-September
6M8143A01 - Department of Fire Life Safety Support for PDC Projects (190723).pdf
6M8143A02 - MACARTHUR STATION UNDERPASS LIGHTING DESIGN (190927).pdf
6M8143B02 - Fire Life Safety (FLS) support to BART Department of FLS (190807).pdf
6M8143B03 - Fire Life Safety (FLS) technical support to BART projects (190925).pdf
6M8143B04 - Fire Life Safety (FLS) technical support to BART (190807).pdf
October-December
6M8143A03 - Escalator Liason Services (191122).pdf
6M8143B05-01 C25 Interlocking Renewal Project - DSDC(191029).pdf
6M8143B06 - Material Testing of Hanger Rods and Connections (191213).pdf
6M8143C01 - eBART QMS (191217).pdf
2020
January-March
6M8143B07 - Richmond Yard Control Tower Access (200131).pdf
6M8143B08 - Millbrea Station TOD Support (200114).pdf
April-June
6M8143B11-01 – Water Intrusion Condition Assessment Project (200528).pdf
July-September
6M8143A05-01 – Hayward Maintenance Complex Phase II East Storage Yard VE Study (200806).pdf
6M8143A04-01 – Trans-Bay Corridor Core Capacity Project Risk (200818).pdf
6M8143C02-01 – Passenger Information System Discovery and Concept of Operations (200824).pdf
October-December
6M8143 Work Plan No. B.07-02 – Design of Access Platforms with Ladders and Stairway Egress for BART Richmond and Concord Control Towers (201030).pdf
6M8143 Work Plan No. B.06-02 – Material Testing Services of Hanger Rods and Connections (211205).pdf
2021
January-March
6M8143 Work Plan No. B.14-01 – BSV II FireLife Safety Support (210308).pdf
6M8143 Work Plan No. B.13-01 – Daly City & Hayward Yard Control Tower Access (210323).pdf
April-June
6M8143B.15-01 Structural Engineering Support (210421).pdf
6M8143B.16-01 Project Management Support (210421).pdf
6M8143B.17-01– Project Manager Support for Electrical Projects (210422).pdf
6M8143A08-01-Ashby Bicycle Improvement Design(140521).pdf
July-September
6M8143A04-02 Transbay Corridor Core Capacity Project Risk Manager (210805).pdf
6M8143B07-03 Structural Inspections – Richmond and Concord Yards (210820).pdf
6M8143B12-02 – BSV-II Fire Engineering Support (210910).pdf
October-December
6M8143A09-01 – Capital Project Delivery Optimization (211022).pdf
6M8143B18-01 – Project Management Support (211203).pdf
6M8143 B12-01 FLS Technical Support (201102).pdf
2022
April-June
6M8143B19-01 – TCCCP Project Management Support (220401).pdf
6M8143B07-05 - Emergency Access Stairs (220418).pdf
6M8143B20-01 - PPMS- Phase 2 Implementation Support (220421).pdf
6M8143B22-01 - Underground Structural Design and Construction (220427).pdf
6M8143B21-01 - Silicon Valley Berryessa Extension Tunnel Seismic Assessment (220516).pdf
6M8143B22-01 – Underground Structural Design & Construction (220606).pdf
6M8143 B24-01 - BSVII Fire Life Safety Support (220712).pdf
October-December
6M8143A06-02 09AU-120 DSDC - General Structures (221010).pdf
6M8143A02-02 MacArthur Station Underpass Lighting Final Design Amendment (221010).pdf
6M8143B28-01 HMC South End Connector Project Track Survey (221128).pdf
6M8143 B25-01 Perform Existing Utility Survey at Hayward Yard (221229) (Rev240723).pdf
6M8143 B23-01 Silicon Valley Berryessa Extension Embankment Seismic Assessment (221229).pdf
2023
January-March
6M8143 B30-01 Fire Life Safety State of Good Repair Support (230111).pdf
April-June
6M8143B27-02 Non-Vital Relay Replacement - Continued Services to Support TCE (230414).pdf
6M8143 B22-02 Continued Underground Structural Design & Construction Support (230619).pdf
July-September
6M8143 C02-01 101 8th Street, Oakland - MET Building Seismic Analysis (230703).pdf
6M8143 B38-01 Program Management Support - Project Controls Reporting (230802)(Rev240223).pdf
6M8143 B35-01 2201 Valley St - Geotechnical Engineering and SSSI (230817)
6M8143 B40-01 BSVII Fire Life Safety Support - FY24 (230926)
6M8143 A11-01 Dublin Pleasanton Access Improvements Survey Svcs (230928)
October-December
6M8143 B17-02 Project Management Services for Electrical Projects (231109).pdf
6M8143 B45-01 Structural Analysis for the New BART Police Headquarter (231121)
6M8143 A04-04 Core Capacity Project - Risk Management (231121).pdf (bart.gov)
6M8143 A12-01 Fare Collection Engineering Support Services (231212).pdf
6M8143 B34-01 Elevator Renovation Phase 1.3 -- Final Design and Bid Support (231219).pdf
2024
January-March
6M8143 B.30-02 Fire Life Safety State of Good Repair Support (240110).pdf
6M8143 B.47-01 Core Capacity Project Grants Development Support (240129).pdf
6M8143 B.50-01 Program Management Support-Project Controls Reporting (240214).pdf
April-June
6M8143 A.13-01 TIRCP Application for North Berkeley BART Access Improvements (240621).pdf
July-September
6M8143 B.55-01 BSVII Fire Life Safety Support - FY25 (240905).pdf
October-December
6M8143 A.02-03 MacArthur Station Lighting Improvement Project (241029).pdf
6M8144 (HNTB/FMG)
2019
April-June
6M8144A01 - El Cerrito Del Norte Platform Storefront Wall (190619).pdf
6M8144A01-02 - El Cerrito Del Norte Reduced SOW Phase 2 (190619).pdf
6M8144A02 - Accessibility Improvements – Richmond (190503).pdf
6M8144B11 - Electrical Project Manager Support (190614).pdf
July-September
6M8144B01 - M&E Program Management Support (190705).pdf
6M8144B05 - TCCCP Traction Power Substation Design (190705).pdf
6M8144A06-01 Accessibility Improvement Program - Phase 2B(190905).pdf
6M8144B18-01 34.5 kV Cable Replacement Conduit Testing(190905).pdf
6M8144B04-03 K-Line Interlocking Replacement Project(FINAL)(190912).pdf
October-December
6M8144A10 - 19th Street Station Modernization (191211).pdf
6M8144B09-01 Fence Rehabilitation Project A and R Line(191008).pdf
6M8144B19-01 OKS G Spur IFB and DSDC(191010).pdf
6M8144B06-01 W-Line Tunnel Water Intrusion Assessment Project(191022).pdf
6M8144B16-01 Berkeley Hills Tunnels Water Intrusion Assessment Project(191022).pdf
6M8144B14-01 Tunnel Waterproofing Design Services - M-Line(191023).pdf
6M8144B13-01 Tunnel Waterproofing Design Services - R-Line(191025).pdf
6M8144A09-01 Earthquake Safety Program – Transbay Tube (191107).pdf
2020
January-March
6M8144A01-04 - Additional As-Needed Design Services During Construction (200212).pdf
6M8144A03-01 – Wayfinding Improvements Phase 4 (200221).pdf
6M8144A07-01 – Balboa Park Station – Phase 2 (200330).pdf
April-June
July-September
6M8144 Work Plan No. A.05-02 – K-Line Enabling Works - 95% Redesign (200928).pdf
6M8144 Work Plan No. B.05-02 – TCCCP EB TPSS - A Line ETTS Design (210108).pdf
October-December
2021
April-June
6M8144A03-02 – Wayfinding Improvements Phase 4 -Part 2 (210407).pdf
6M8144A03-03 – Wayfinding Improvements Phase 4 (210407).pdf
6M8144B20-01-Cable Replacement Design Revision(250521).pdf
6M8144A10-02-19th St Station Mod(100621).pdf
6M8144B05-03- TCCCP Traction Power Substation Additional Design Scope (210621).pdf
October-December
6M8144A05-03 – K-Line Enabling Works Supplement (211006).pdf
6M8144A01-07 – Design Services for El Cerrito Del Norte Station Modernization Project (211101).pdf
6M8144B19-02 – OKS G Spur DSDC (211110).pdf
6M8144B20-02 - C and K-Line 34.5kV Cable Replacement - Design Revisions (211118).pdf
6M8144A07-02 – Balboa Park Station – Passenger Drop-Off (211210).pdf
2022
January-March
6M8144B05-01 – TCCCP Traction Power Substation Design (original 190705) (Updated 220119).pdf
6M8144B14-02 – M-Line Tunnel Water Mitigation Additional Design Services (220217).pdf
6M8144A06-02 – Accessibility Improvements Project Phase 2B (220224).pdf
April-June
6M8144 A.05-04 - CBTC Enabling Works K-Line (220504).pdf
6M8144 A.10-03 - 19th St Station Mod - DSDC Services (220622).pdf
July-September
6M8144B01-02 PM and PGM Support for RR Civil, Structures and Track projects (220819).pdf
6M8144B04-04 K Line Interlocking Reaplcement Project - Supplemental Final Design (220907).pdf
October-December
6M8144B05-05 East Bay TPSS 15EK601 AEY Substation Design Modification (221007).pdf
6M8144B05-04 East Bay TPSS Core Capacity DSDC (221122).pdf
2023
January-March
6M8144A05-05 Repackage IFB set for Enabling Works contract 49Gh-135 (230131).pdf
April-June
6M8144A10-04 07EA-120 19th St Station Modernization HNTB-FMG DSDC (230414).pdf
6M8144 A05-06 Contract Bid support of K-line Enabling Works (230508).pdf
6M8144 B01-03 Project Program Management Support (230522).pdf
2024
January-March
6M8145 (Jacobs)
2019
April-June
6M8145B.01-01 - Update of BFS Structural Design Criteria (190405).pdf
6M8145C01 - New Rail Vehicle Change Order Review Audit (190612).pdf
July-September
6M8145A01 - Customer Access Program (190705).pdf
6M8145B06 - Replacement of Hanger Rods at Catwalks at A&L-Lines (190705).pdf
6M8145B08-01 Program Management Support, Measure RR Funded Track Projects (190904).pdf
6M8145B10 - Miscellaneous Support to Design Services During Construction (190924).pdf
6M8145B03-01 Noise Measurement using Corr Tracker software(190905).pdf
6M8145B02-01 Measure RR Funded Structure Projects - Program Management Support (190906).pdf
October-December
6M8145B05-01 – Fire Alarm System Engineering (191002).pdf
6M8145A03-01 DSDC - Record Drawing - MacArthur BART Plaza Project(191022).pdf
6M8145A02-01 Walnut Creek Station - Emergency Egress Stairs (191105).pdf
6M8145A5 - Lake Merritt Plaza Concept Design (191217).pdf
6M8145B07 - C75 Storage for Portable Substations (191112).pdf
6M8145B11-01 TBT CP System Assessment Project (191105).pdf
6M8145B13 - Line A Arch Flash Analysis (191205).pdf
2020
January-March
6M8145A2-02 - Walnut Creek Station - Emergency Egress Stairs (200204).pdf
6M8145B01-02 - Update Structures BFS-Commentary (200212).pdf
6M8145B14 - Electrical Engineering Support - BART Facility Projects (200114).pdf
6M8145A04-02 – Updated Retrofit Design Ground Motions for the Transbay Tube (TBT) (200207).pdf
6M8145B15-01 – M&E Project Coordination Support (200214).pdf
6M8145A06-01 – Reroofing and Water Intrusion at Train Control Rooms (200221).pdf
April-June
6M8145B18-01 – RR Financed Contracts Change Order Review-Audit (200403).pdf
6M8145B17-01 – Lake Merritt Administration HVAC Renovation - Final Design (200616).pdf (updated)
6M8145A08-01 – 19th Street Bike Station (200617).pdf
6M8145A02-03 – Walnut Creek Station - Emergency Egress Stairs (200630).pdf
July-September
6M8145A04-03 – Updated Retrofit Design Ground Motions for the Transbay Tube (TBT) (200723).pdf
6M8145A02-04 – Walnut Creek Station - Emergency Egress Stairs (200723).pdf
6M8145A09 – Lidar Survey Demonstration (200924).pdf
6M8145B7-02- Portable Substation Storage (updated 030521).pdf
October-December
6M8145 Work Plan No. A.11-01 – HMC2 Enviornmental Study (201027).pdf
6M8145 Work Plan No. A.10-01 – Capital Project Delivery Optimization Support (201103).pdf
6M8145B03-02 - Noise Measurement (201222).pdf
6M8145B17-02- 54RR510 LMA HVAC (updated 030521).pdf
6M8145B20-01 Silicon Valley Berryessa Extension(updated 030521).pdf
2021
January-March
6M8145 Work Plan No. C.01-02 – New Rail Vehicle Change Order Review Audit (201209).pdf
6M8145 Work Plan No. B.03-02 – Provide the independent assessment for SVBX (21105).pdf
6M8145 Work Plan No. A.12-01 – Transbay Tube (TBT) (210209).pdf
6M8145B23-01 – Operation Central Control (OCC) Modernization (210308).pdf
6M8145 Work Plan No. A.15-01 – Provide Organization Capacity (200216).pdf
6M8145 Work Plan No. B.25-01 – Office Engineering (210202).pdf
6M8145 Work Plan No. A.14-01 – Laser Scanning of the Steel Liner in the Tube (210125) Updated.pdf
6M8145 Work Plan No. B.26-01 – Train Control - Multiplex Procurement (210317).pdf
6M8145 Work Plan No. B.29-01 – LKS Lab relocation (210322).pdf
6M8145 Work Plan No. B.28-01 – Fare Collection - Software Programming (210317).pdf
6M8145B.14-02 - Electrical Engineering Design Support for Oak Emergency generator (210331).pdf
April-June
6M8145B.27-01– Ultrasonic Testing and Rail Procurement Support (260421).pdf
6M8145B32-01-FV Annual Cathodic Protection Survey (070521).pdf
6M8145B02-02 – Measure RR All Programs PM Support (210519).pdf (updated)
6M8145B19-01 – Incident Energy Analysis (210521).pdf (updated)
6M8145B.20-02-Silicon Valley Berryessa Extension Seismic (150621).pdf
6M8145A17-01-15IF-130A Powell St Ceiling Improvements (250621).pdf
July-September
6M8145B07-03 – C75 Storage of Portable Substations (210803).pdf
6M8145A11-02 – HMC Phase II Permit Approval Support (210805).pdf
6M8145B33-01 – Systems PM Support (210910).pdf
October-December
6M8145B08-02 – Project Management Support for FTA Projects (211004).pdf
6M8145B31-01 – BART Police Department Rooms Modernization at Met G (211025).pdf
6M8145B28-02 – Fare Collection - Software Programming (211101).pdf
2022
January-March
6M8145B09-01 – PM Support for BART Train Control Projects (220126).pdf
6M8145B26-02 – Train Control Room Multiplex and Speed Encoding (NS MUX) (220201).pdf
6M8145B28-03 – Fare Gate Renovation and Rehabilitation (220217).pdf
6M8145B20-03 – Silicon Valley Berryessa Extension Seismic Assessment (220325).pdf
April-June
6M8145A05-02 – Lake Merritt Plaza Upgrade - Two Conceptual Designs (220408).pdf
6M8145B14-03 -Oakland Emergency Generator (OEG) -Systems Engineer (220502).pdf
6M8145B15-03 - M&E Project Coordination Support (220503).pdf
6M8145B03-03 – Noise Measurement Services (220606).pdf
6M8145A15-02 – Core Capacity Program - Stakeholder Engagement (220617).pdf
6M8145 B.36-01 - Embarcadero & D. Berkeley Stations Restroom Reopening - Assess & Design (220624).pdf
July-September
6M8145A18-01 CBTC Planner for System Access Department (220804).pdf
October-December
6M8145B.38-01 PPMS Phase 2 - Contract Mgmt, Budget & Finance, and Schedule Mgmt Modules (221107).pdf
2023
January-March
6M8145B09-02 Project Management Support for Train Control Projects (230109).pdf
6M8145A14-02 Complete Laser Scanning of TBT (230120).pdf
6M8145B27-02 Ultrasonic Testing and Rail Procurement Support (230213).pdf
April-June
6M8145 B14-04 Electrical Engineer Support for OEG Project (230517).pdf
July-September
6M8145 B.09.03 Project Management Support for NS MUX Train Control Project Contd. (230714).pdf
2024
October-December
6M8145 B.17-03 Final Design Submittal and Design Bid Support for LMA HVAC Renovation (241021).pdf
6M8146 (Parsons)
2019
April-June
6M8146A01 - TCMP Enabling Works Support (190501).pdf
July-September
6M8146A03 - Transbay Tube Seismic Retrofit(190924).pdf
6M8146B05-01 - Pittsburg-Bay Point Elevator Renewal v2 (190715).pdf
6M8146A04-01 – ICS Modernization CBTC Support CSE(190827).pdf
6M8146B08-01 Slope Stabilization(190903).pdf
6M8146B02-01 A-Line Interlocking Track Replacement IFB,DSDC(190903).pdf
6M8146B03-01 Richmond Yard Track Renewal(190904).pdf
6M8146B01 – Traction Power TP11-12 (190917).pdf
6M8146 Work Plan No. B.03-02 – IFB100% Package and Train Control (201020) Updated.pdf
October-December
6M8146C.01-01 – Richmond Fare Gates Rider Surveys (191004).pdf
6M8146B04-01 C-Line (CRO-CLA) 34.5 kV Cable Replacement Project(191007).pdf
6M8146B07 - Vent Grate Rehabilitation - EB (191231).pdf
2020
January-March
6M8146B06 - Vent Grate Rehabilitation (200102).pdf
6M8146B09-01 – Traction Power Support (200323).pdf
6M8146B01-02 – Traction Power TP-11 & TP-12 (200324).pdf
6M8146A05-01 –TCMP (200326).pdf
6M8146A07-01 – VTA Support (200326).pdf
6M8146 Work Plan No. B.11-02 – Fire Protection Support (210317).pdf
April-June
6M8146B11-01 – Fire Protection Support (200403).pdf
6M8146B10-01 – Project Support Services for BART-Constructed TP Projects (200415).pdf
6M8146B05-02 – Bay Point Elevator Renewal- LiftNet, R3 (200508).pdf
6M8146B08-02 – MW-12 Slope Stabilization (200513).pdf
6M8146 Work Plan No. B.06-02 – Vent Grate Rehabilitation - SF-MTA 100% Final Design and BMS Coordination (201230).pdf
July-September
6M8146B12-01 – Financial Support Services for M&E Capital Programs (200824).pdf
6M8146A08-01-BHQ Community Outreach (Updated 210503).pdf
2021
January-March
6M8146 Work Plan No. B.08-03 – Additional Design for South Slope, DSDC and others (201109).pdf
6M8146 Work Plan No. A.09-01 – ESP Design Oversight (210209) Updated.pdf
6M8146 Work Plan No. B14-01 – COMMUNITY RELATIONS SUPPORT (210222).pdf
6M8146B12-01 – Financial Support Services for M&E Capital Programs (200824).pdf
6M8146B15-01- Project Engineer for Project 15EK200 and 15EK350 Traction Power Projects (210331).pdf
6M8146 B.07-02 – Vent Grate Rehabilitation – EB DSDC (210222)
April-June
6M8146A.10-01 01RQ-102 HMC Phase 2 Civil Grading (210421).pdf
6M8146C02-01-Paratransit Contactless Payment (040521).pdf
6M8146A06-01-Additional Design Services for North Berkeley (100621).pdf
6M8146B08-04-Additional Engineering Support for the MW12 (070621).pdf
6M81462B10-02- Project Support Services for BART-Constructed Projects(060321).pdf
July-September
6M8146C02-02 – ParaTransit Software Procurement (210916).pdf
October-December
6M8146B08-05 – MW12 Slope Stabilization Project (211214).pdf
2022
January-March
6M8146A09-02 – ESP Design Oversight (220223).pdf
6M8146B11-03 – Fire Protection Support (220308).pdf
6M8146C03-01 – BART Official App Parking Enhancements & Support (220314) .pdf
6M8146A11-01 – TCMP CBTC Office Engineer for System Access (220323).pdf
6M8146 B.05-03 - Final Design & DSDC service for Pittsburg Bay Point Elevator Renovation Project (220503).pdf
6M8146 B.5-03 - Final Design & DSDC service for Pittsburg Bay Point Elevator Renovation Project (220503).pdf
April-June
6M8146 C.4-01 - Paratransit Contactless Payment - Change Order 001 (220511).pdf
6M8146 A.12-01 - HMC1 - Vehicle Overhaul & Heavy Repair Shop (220511).pdf
July-September
6M8146 B.16-01 - Elevator Renovation Phase 1.3 Engineering Services for Field Assessment and CER report (220714).pdf
6M8146B11-04 Fire Life Safety - Fire Protection Support (220829).pdf
October-December
6M8146B.15-03 PTPSS 15EK201 DSDC Support (221007).pdf
6M8146A13-01 Non-Revenue Eletcric Vehicle Strategic Planning (221021).pdf
6M8146B15-02 Project Engineer for 15EK350 Traction Power Projects (221128).pdf
6M8146A03-02 CBTC 49GH004 Office Engineer Support for Track Allocation (221207).pdf
6M8146 B10-03 Project Support Services for BART - Constructed Projects (221216) (Rev 231127)
6M8146A14-01 Core Capacity - Executive Administrator (221219).pdf
6M8146 A09-03 Design Oversight (221228).pdf
2023
January-March
6M8146 C05-01 EZ Rider Parking Program Transition – Software Releases 1 & 2 (230117).pdf
6M8146 B19-01 34.5 kV Project Support (230123).pdf
6M8146 B18-01 Community Relations for C15 (40%), A85 (45%), and A-Line 34.5 kV (15%) (230126).pdf
April-June
6M8146 Measure RR Traction Power Engineering Support - Principal Engineer (230601).pdf
October-December
6M8146 B27-01 PM Support for Train Control and Communications Projects (231010)
6M8146 B15-05 PTPSS 15EK201 DSDC Support (231114)
6M8146 B15-06 Project Engineer for 15EK350 Traction Power Projects (231114).pdf
6M8146 B.33-01 SCADA Communications Engineering Services (240216).pdf
2024
April-June
6M8146 B.10-04 Programmatic Support for Capital Construction Division Part A (240415).pdf
6M8146 B.35-01 PM Support for Mechanical Projects (240520).pdf (bart.gov)
6M8146 B.40-01 Electrical and Train Control Project Management Support (240610).pdf
6M8146 B.38-01 Project Management Services for Traction Power and Electrical Projects (240610).pdf
July-September
6M8146 B.11-05 Fire Life Safety - Fire Protection Support (240702).pdf
6M8146 B.19-02 34.5 kV Project Support - Transitional Work Plan (240830).pdf
October-December
6M8146 A.18-01 15CQ008 K Line Interlocking Design Services During Construction (241025).pdf
6M8147 (PGH Wong)
2019
April-June
6M8147A01 - BART Earthquake Safety Program Transbay Tube (TBT) (190521).pdf
6M8147A03 - Project Management Support (190619).pdf
6M8147B05 - A77 Interlocking Enabling Work (190619).pdf
July-September
6M8147B04 - A77 Interlocking Renewal Project - Additional Design and DSDC (190813)(Rev 240517).pdf
6M8147B06-01 C,M, and W Line Fence Replacement Project(190903).pdf
October-December
6M8147B03-01 Fall Protection Assessment for A-Lines, C-Line, and R-Line (191105).pdf
6M8147A01-02 - Earthquake Safety Program TBT Retrofit (191205).pdf
6M8147A05-01 eBART Design Services During Construction (191107).pdf
6M8147B08 - Railroad Track and Geometry Design Class (191213).pdf
January-March
6M8147A06 -19th St Oakland Station New Street Elevator (200303).pdf
6M8147A08-01 – BART Tail Track Extension Project – Millbrae and Pleasanton Tail Tracks (200207).pdf
6M8147A10-01 – WongCMS Updates (200220).pdf
6M8147B01-02 – 34.5kV Cable Upgrade Design and Planning Support (200325).pdf
April-June
6M8147A03-02 – Program Management Support (200414).pdf
6M8147B10-01 – MET G Emergency Generator Geotech Investigation (200416).pdf
6M8147A11-01 – Preparation of Record Drawings for BART Earthquake (200420).pdf
6M8147A12-01 – Administrative and Invoice Support for Earthquake (200427).pdf
6M8147B09-01 – Elevator Modernization Project Phase 1A (200508).pdf
6M8147A09-01 – BART Hayward Maintenance Complex (HMC) Phase 2 East Storage Yard Project (200515).pdf
6M8147B11-01 – Railroad Track Inspection and Safety Standards Class (200527).pdf
6M8147A01-03 – Earthquake Safety Program Transbay Tube Seismic Retrofit Project (200616).pdf
July-September
6M8147A13-01 – HMC2 East Storage Yard - Mainline Trackwork Project DSDC (200723).pdf
6M8147A14-01 – Irvington Station Design Final Design (200804).pdf
2020
July-September
6M8147A16-01 – Transbay Corridor Core Capacity Project Management Oversight (PMO) Lead (200902).pdf
October-December
6M8147B.01-03 – 34.5kV Cable Upgrade Design and Planning (201120) Updated.pdf
2021
October-December
6M8147A08-02 – Millbrae and Dublin-Pleasanton Tail Tracks Extension (211110).pdf
2022
January-March
6M8147A09-02 – (HMC) Phase 2 East Storage Yard Project (220114).pdf
October-December
6M8147B09-02 Final Design and Bid Support for Coliseum Elevator Project (221121).pdf
6M8147A02-02 Relocated OCY Wheel Truing Facility Final Design (221222).pdf
2023
January-March
6M8147B13-01 Fire Alarm System (230131).pdf
July-September
October-December
2024
January-March
6M8147 .04-02 Final Design and Bid Support for Embarcadero Platform Elevator Project (240209).pdf
6M8147 A.02-03 03QJ001_IFB Truing Wheel Facility & DSDC for Truing Wheel Equipment (240304).pdf
April-June
July-September
October-December
6M8147 B.13-02 15IJRR1 – Fire Alarm Replacement Phase 4 (241007).pdf
6M8148 (TY Lin/TSE)
2019
April-June
6M8148A01 - BART Legacy Train Control Room Power Upgrades and Switch Machine Power and (190619).pdf
6M8148A02 - KTE TPSS Installation (190517).pdf
6M8148A03 - Earthquake Safety Program (190607).pdf
6M8148A04 - HMC Central Warehouse (190619).pdf
6M8148A05 - Hayward Maintenance Complex (190619).pdf
6M8148B03 - Provide Design Services During Construction (DSDC) (190628).pdf
July-September
6M8148B02-01 – Final Design Services for Video Surveillance Systems (07-24-2020 update) (190709).pdf
6M8148A06-01 - HMC Preparation of Record Drawings for Runaround and Back Shop Descoping (190730).pdf
6M8148A07 - VTA’s Phase II BART Extension to Silicon Valley (190927).pdf
6M8148B06-01 Senior Civil for BART M&E Group(190903).pdf
October-December
6M8148A01-02 - Engineering Design Development, 60% to IFB Design (191226).pdf
6M8148B07 - Wayside Coverboard Antenna Replacement (191119).pdf
6M8148A10-01 Train Control Engineering Support (191107).pdf
6M8148A09 - Services During Construction to Support the Engineer of Record (191122).pdf
6M8148C01 - Car Acquisition Planning (191119).pdf
6M8148B15-01 – Secure an encroachment permit from Caltrans (201006).pdf
6M8148B01-02 – Engineering Design Development, Contract Document (201127).pdf
2020
January-March
6M8148B08 - Speed Code Reductions for #10 Mainline Turn-outs (200212).pdf
6M8148A11-01 – Concord Station Modernization Program Design Services (200220).pdf
6M8148B09-01 – Walnut Creek Tunnel Lighting Upgrade (200324).pdf
April-June
6M8148A04-02 – HMC Central Warehouse (200406).pdf
6M8148B12-01 – COVID Budget Analysis (200504).pdf
6M8148A01-03 – TCMP Enabling Works - Switch Machine Power and Control Replacement (200508).pdf
6M8148B13-01 – BART A65-A75 Interlocking Renewal Project (200617).pdf
6M8148B10-01 – eBART Program Management Support (200626).pdf
July-September
6M8148A04-03 – HMC Warehouse - Design Services During Construction - Record Drawings (200820).pdf
6M8148A12-01 – BART Earthquake Safety Program - Transbay Tube Seismic Retrofit(200902).pdf
6M8148A13-01 – Electrical Engineer Support(200903).pdf
6M8148C02-01 – Changing BART’s Operating Cost Structure (200908).pdf
6M8148A02-02 – Provide Seconded Traction Power Engineer (201019).pdf
6M8148A01-04 CBTC Enabling Works TSE Design (030521).pdf
6M8148A04-04 – Engineering Design Development, Contract Document (210377).pdf
October-December
6M8148C03-01 – Changing BART’s Operating Cost Structure Task 2 (200908).pdf
6M8148B16-01 – Engineering support for Systems Engineering (201230).pdf
2021
April-June
6M8148A.01-05 CBTC Enabling Works Contract 49GH-130 Design Services During Construction (210414).pdf
6M8148B.15-01– RR Financed Contracts Change Order Review_Audit (220421).pdf
6M8148B.17-01– TCE Support to TC Crossover Rehab Project(260421).pdf
6M8148 A15-01-57RR-118 19th Street (210521)(Rev 231227).pdf
6M8148A04-05 – HMC Central Warehouse (210624).pdf
6M8148B18-01-A85 Design Services (290621).pdf
July-September
6M8148B20-01 – Sr Civil Engineers (010721).pdf
6M8148B21-01 – Non-Vital Relay Replacement (Cont. Service to TCE) (210721).pdf
6M8148B22-01 – Train Control Engineering Support for iVPI Software (210803).pdf
6M8148B23-01 – Train Control Engineering Support to Safety Assessment CIRCA (210916).pdf
October-December
6M8148B24-01 – DSDC FOR M Line and K Line 34.5kV Projects (211012).pdf
6M8148B03-02 – Engineering Support on OEG System (211012).pdf
6M8148A11-02 – Concord Station Modernization Lighting Upgrade (211202).pdf
6M8148B25-01 – Project Management Support (211203).pdf
2022
January-March
6M8148A15-02 – 19th Street-Oakland Bike Station – Final Design (220114).pdf
April-June
6M8148B16-02 – Engineering support for Systems Engineering (220607).pdf
July-September
6M8148B27-01 Senior Civil Engineer Support (220825).pdf
October-December
6M8148A11-03 TY Lin + TSE - Concord Station Lighting Modernization and UPS Project (221104).pdf
6M8148A17-01 CBTC - BART CSE Support for CAS and ATS ICS Support (221128).pdf
6M8148A18-01 CBTC - BART CSE Support for CAS and ATS ICS Support (221128).pdf
2023
January-March
6M8148A16-03 – HMC2_East Storage Yard Final Design 100% (230112).pdf
6M8148A16-01 – HMC2 East Storage Yard Final Design 60% IFB (220303)(Updated 230208).pdf
6M8148B29-01 – Project Support for Electrical Engineering Projects (230223).pdf
6M8148 A15-3 19th Street Oakland Bike Station – Final Design Add 2 (230315).pdf
April-June
6M8148 B30-01 Traction Power Engineering Support for M & E (230428).pdf
6M8148 A01-06 DSDC support for Self-Performed Enabling Works (230512).pdf
6M8148 B32-01 SCOPE OF SERVICES - 34.5kV R Line DSDC (230601).pdf
2024
January-March
6M8148 A.19-01 MOCC- Systems Integration Design (240322) (rev 240817).pdf
April-June
6M8148 B.31-02 15EJRRA A Line 34.5kV AC Cable Replacement DSDC Service Continued (240404).pdf
6M8148 B.03-03 Oakland Emergency Generator (OEG) System - MACS System DSDC (240411).pdf
July-September
6M8148 A01-06 DSDC support for Self-Performed Enabling Works (230512) (Rev 240719).pdf
6M8148 B.32-02 R-Line 34.5kV Cable Replacement as-builts (240829).pdf
6M8148 B.24-04 DSDC for K-line 34.5kV Cable Replacement Project (KTE-KWS) 15EJRRK (240926).pdf
October-December
6M8148 A.19-02 15IJRR1 MOCC Systems Integration Design - Part 2 (241016).pdf
6M8149 (WSP)
2019
January-March
6M8149B02-03 – BFS Updates - Tunnel Design Criteria (210317).pdf
April-June
6M8149B01 -Systemwide Cross-passage Doors Replacement (190423).pdf
6M8149B02 -BFS Update to Structural Design Criteria (190614).pdf
July-September
6M8149A02–01 TBT Pump System Upgrades DSDC(190827).pdf
6M8149B05-01 Final Design - SFTS and OTS Blast Dampers(190917).pdf
6M8149B06 -Transbay Tube Tunnel Lighting Phase II (190924).pdf
6M8149A04-02 – Iron Horse Trail Project – Additional Work (210302).pdf
October-December
6M8149A04-01 – Iron Horse Trail Additional Services (191001).pdf
6M8149B02-02 -BFS Update to Structural Design Criteria (191126).pdf
6M8149B03-01 Studies on Bearing Pads of BART Aerial Structures(191022).pdf
6M8149B07-01 ATO Whistle Stops(191030).pdf
6M8149B08 -Post IFB Services (191126).pdf
6M8149B10 -Post-Design Services(191231).pdf
6M8149 B.12-01 -Strategic Engineering Program Mgmt Support (191126).pdf
6M8149B13 -M&E Support of Project Delivery (191206).pdf
6M8149B14 -Strategic Engineering Scheduling Support (191206).pdf
2020
January-March
6M8149B04 -Water Intrusion Repair Final Design (200114).pdf
6M8149B17-01 – Emergency Lighting Design Support (200319).pdf
April-June
6M8149B09-01 – TCCCP West Bay TPSS Additional Services (200427).pdf
6M8149A06-01 – Transit Health and Safety Plan (200626).pdf
July-September
6M8149B08-02 – Amendment No. 1 to Work Plan Proposal No. B.08 - Post-IFB Services (200724).pdf
6M8149A06-02 – Transit Health and Safety Plan – Online Dashboard (200924).pdf
October-December
6M8149B15-01 – Design and DSDC of Acoustic Panel Anchorage (201030).pdf
6M8149B16-01 – TCCCP West Bay TPSS Post-Design Services (20112).pdf
2021
January-March
6M8149A02-02 – TBT Pump System Upgrades DSDC (210216).pdf
6M8149B05-02 – Blast Dampers Replacement (210331).pdf
April-June
6M8149B.04-02 CBTC Elevated Stations Water Intrusion A,C and R Lines (210416).pdf
July-September
6M8149B08-03 – 34.5kV A Line Cable Replacement - DSDC (210927).pdf
October-December
6M8149A07-02 – Core Capacity Program Project Controls (211108).pdf
6M8149B.08-04 - DSDC Services (211118).pdf
2022
January-March
6M8149B18-01 – Berkeley Hills Tunnel Power Distribution System Replacement (220110).pdf
6M8149A08-01 – Grant Application Preparation Support for TIRCP (220119).pdf
6M8149B17-02 – Electrical Engineering Design for Station Lighting Upgrade Projects (220119).pdf
July-September
6M8149B12-02 - Maintenance and Engineering Support of Program Management (220722).pdf
2023
January-March
6M8149B15-02 – Design and DSDC of Acoustic Panel Anchorage (220303) (updated 230224).pdf
April-June
6M8149 B08-05 Structural Engineering Services for Traction Power (230616).pdf
July-September
6M8149 B12-03 Project Management Support for Maintenance and Engineering Projects and Programs (230815)
October-December
6M8149 B19-02 CWC Substation EOR Support (231114)
6M8149 A04-03 Dublin Pleasanton Access Improvements Addl Design & Bidding Services (231121)
6M8159 (HNTB)
2019
July-September
6M8159A01 - NTRC Program Definition (190813).pdf
October-December
6M8159A01-02 NTRC - Supplemental Work Plan A.01-02(191025).pdf
2020
January-March
April-June
6M8159A02-02 – NTRC Program Definition and Management (200429).pdf
October-December
6M8159A.03-NTRC Program Management (Updated 210503).pdf
2021
April-June
6M8159A03-02 – Additional Engagement and Outreach (210407).pdf
October-December
6M8159A04-01 – Phase 0 Closeout (211011).pdf
6M6136 (Arup)
2019
October-December
6M6136A.03-01 – Valley Link Coordination Support (191105).pdf
2020
April-June
6M6136A04-01 – El Cerrito Plaza Parking Study (200513).pdf
6M6136A05-01 – Tunnel Lighting Review (200519).pdf
6M6136A05-02 – Tunnel Lighting Review – Additional Services (200617).pdf
2021
January-March
6M6136A08-01 – Affordable Housing and Sustainable Communities Grant (210216).pdf
6M6136A09-01 – Environmental Support (110521).pdf
July-September
6M6136A10-01 – Environmental Support - Operating (210804).pdf
6M6136A01-01 – BART Metro 2030 and Beyond Study (210916).pdf
6M6136A11-01 – Capital Project Environmental Support (210916).pdf
2022
July-September
6M6136A13-01 – BART A-Line Jobs Attraction Study (220721).pdf
6M6136A12-01 – Regional All-Agency Institutional Pass Pilot (220808).pdf
October-December
6M6136A13-02 BART A-Line Jobs Attraction Study Supplemental Work Plan (221031).pdf
2023
January-March
6M6136 A14-01 BayPass Pilot – Strategic Planning, Communications and Evaluation (230309).pdf
October-December
6M6136 A15-01 BART's Safety Action Plan for Roadways (231121)
2024
January-March
6M6136 A.15-01 BART's Safety Action Plan for Roadways (240221).pdf
6M6136 A.16-01 Waste Target Setting (240320)_0.pdf
April-June
6M6136 A.16-01 Waste Target Setting (240404).pdf
6M6136 A.18-01 Sustainability Action Plan 2025 (240522).pdf
6M6136 A.19-01 BART Kit of Parts Design (240605).pdf
July-September
6M6136 A.17-01 BART 16th St Plaza Structural Analysis (240715).pdf
6M6137 (Fehr & Peers)
2020
January-March
6M6137A01-01 TOD Access Model Update (200205).doc.pdf
6M6137A02-01 – Walnut Creek Station Modernization North Stairs (200318).pdf
April-June
6M6137A03-01 – System-wide Historic Resources Assessment Part 1 (200513).pdf
October-December
6M6137 A.05 - Stakeholder Process for De-emphasizing Police (201127).pdf
2021
April-June
6M6137A08- Station Access Wayfinding and Signage Program (210407).pdf
6M6137A.04- 2 2150 Webster - Art Project Implementation (210414).pdf
6M6137A07-02-Berkeley El Cerrito Corridor Access Plan(130521).pdf
July-September
6M6137A04-03-2150 Webster Art Project Implementation (010721).pdf
2021
July-September
6M6137A07-03 – BART Corridor Access Study (210716).pdf
6M6137A09 El Cerrito Plaza BART TOD Access Plan (210824).pdf
October-December
6M6137A04-04 – 2150 Webster - Art Project Implementation - Amendment 2 (211112).pdf
2022
January-March
6M6137A10 – Operational Simulation Analysis in Support of BART Metro 2030 and Beyond (220112).pdf
April-June
6M6137 A.04-05 - 2150 Webster Art Integration (220418).pdf
July-September
6M6137 A.07-04 - Berkeley El Cerrito Corridor Access Plan Phase 3 (220721).pdf
2023
January-March
6M6137 A09-02 El Cerrito Plaza TOD Access Plan - Additional Scope (230317).pdf
6M6137 A11 2022 BART Role in the Region (230320).pdf
July-September
6M6137 A12 North Berkeley BART TOD Access Plan (230808)
6M6137 A15 El Cerrito Plaza BART Study Area Lighting Plan (230814)
6M6137 A13-01 Bicycle Preferred Path of Travel Capital Plan Phase 1 (230816)
6M6137 A14-01 Route Restoration Grant Planning Work (230921)
October-December
2024
January-March
6M6137 A.16-01 FTA TOD Pilot Task 6 Richmond El Cerrito TDM Implementation Plan (240228).pdf
April-June
July-September
6M6137 A.12.02 CM North Berkeley BART TOD Access Plan - Added Scope (240816).pdf
6M6138 (HNTB)
2019
October-December
6M6138C03-01 West Oakland Development Negotiation Support (191106).pdf
6M6138C01-01 Daily Parking Implementation (191106).pdf
6M6138C02-01 Paratransit Software Business Case Justification (191106).pdf
6M6138C04-01 Automated License Plate Recognition Enforcement (192211).doc.pdf
2020
January - March
6M6138C06-01 – 2150 Webster Street - Program Management (200320).pdf
6M6138C05-01 – 2150 Webster Street – Change Management (200320).pdf
April-June
6M6138A05-01 – BART SWPPP Compliance Monitoring (200414).pdf
6M6138A06-01 – Richmond Yard Fence Rehabilitation (200427).pdf
6M6138C07-01 – BART Mobile App Permit (200617).pdf
July-September
6M6138A02-01 – Lake Merritt Economic Advisory Services (200708).pdf
6M6138B01-01 – BART Next Generation Fare Gates (200722).pdf
2021
January-March
6M6138C02-02 – Paratransit Software Analysis (210205).pdf
April-June
6M6138C08-01-Parking Payment Machines Modernization(100621).pdf
July-September
6M6138A07-01 – SWPPP Compliance Monitoring (210723).pdf
6M6138B02-01 – Next Generation Fare Gates (210909).pdf (updated)
October-December
6M6138A01-01 – BART Future Operating Plan Development (211006).pdf
2022
July-September
6M6138 C.09-01 Parking Request for Expressions of Interest (220721).pdf
6M6138A08-01 Economic Advisory Services for TOD Projects FY23-24 (220818).pdf
October-December
6M6138B02-03 Next Generation Fare Gates (221028).pdf
2023
January-March
6M6138 A06-02 Richmond Yard Fence Rehabilitation - Environmental Monitoring - Extension (230322).pdf
6M6138 C.10-01 NEPA Review for BART Police Dept. Relocation (240321).pdf
April-June
6M6138 C.11-01 BART A-Line Jobs Attraction Study - Final Report (240402).pdf
2024
April-June
6M6138 C.12-01 Economic Advisory Services for TOD Projects North Berkeley, Walnut Creek (240605).pdf
July-September
6M6138 C.13-01 Economic Advisory Services for TOD Projects North Concord (240712).pdf
6M8207 (GANNETT FLEMING)
January-March
6M8207 A.01-01 GEC Services for New BART Police Headquarters (240122)_0.pdf
6M8209 (HNTB-FMG JV)
2023
October-December
6M8209 A01-01 Wayfinding Improvements Phase 3 (231220)_0.pdf
6M8209 A02-01 09AU-120 Program and Document Control Support (231219).pdf
2024
January-March
6M8209 A.07-01 Project Management Support for Civil, Track and Structures Projects (240104)_1.pdf
6M8209 A.05-01 East Bay TPSS Core Capacity Design (240209).pdf (bart.gov)
6M8209 A.03-01 K Line Design Completion of Issued for Construction Plans (240312).pdf
April-June
July-September
6M8209 A.06-01 15EJRRK DSDC for K-line (KTT-KMA) 34.5kV Cable Projects.pdf
October-November
6M8209 A.02-02 09AU-120 Program and Document Control Support (241025).pdf
6M6139 (Raimi & Associates)
April-June
6M6139 A01-01 – AB 2923 Implementation – Phase 4 (200413).pdf
2021
January-March
6M6139A01-02 – R-Line Affordable Housing Strategy (210317).pdf
April-June
6M6139 A01-03-R Line TOD Strategy Community Engagement (210610).pdf
October-December
6M6139 A.01-05 – Berkeley Objective Design Standards (211202)(Rev240419).pdf
6M6139 A.01-06 - Needs Assessment and Programming for BPD (211227).pdf
2022
January-March
6M6139A01-04 – Sustainable Station Lighting (220118).pdf
July-September
6M6139A01-07 BPD Administrative HQ Relocation Preliminary Site Alternatives Assessment (220818).pdf
6M8171 (Jacobs)
2020
April-June
6M8171A01-01 – CBTC CM Oversight Services (200617).pdf
October-December
6M8171A01-02 Provide CM Services CBTC for Project 49G-110 (201006).pdf
2021
July-September
6M8171A02-01 Jacobs CM Oversight Management FY22 & FY23 (210818).pdf
2024
January-March
6M8171 A.03-01 49GH008- CBTC - Jacobs - PM CM Oversight (12-2023 thru 02-2025) (240110).pdf
6M8180 (TAG)
2021
April-June
6M8180B.01-01– Concord Yard Turntable Replacement (260421).pdf
6M8180A02-01-Construction Management to Support for HMC(240521).pdf
6M8180A01-01-19th St Station Mod(100621).pdf
6M8180A03-01-HMC 2 Program Controls Support(100621).pdf
July-September
6M8180B.02-01-Construction Management Services- Hayward Yard Fire Protection Project (8.26.21).pdf
6M8180A01-02 – 19th St Station Modernization Community Liaison (210916).pdf
October-December
6M8180A05-01 – Project & CM Services for 2150 Webster Street (211008).pdf
6M8180B03-01 – R65, C15, and A85 Construction Survey (211025).pdf
2022
January-March
6M8180A03-02 – Pre-Construction Manager for HMC 2 (220114).pdf
6M8180A06 – Market Street Entry Canopies CM Support (220303).pdf
April-June
6M8180 A.05-02 - BHQ Project - CM Support (220419).pdf
6M8180 A.07 - HMC2_Community Relations Support (220622).pdf
July-September
6M8180 A07-01 - D&C - Internship Program (220706).pdf
6M8180A09-01 HMC 1 - CM Safety Modification (220930).pdf
October-December
6M8180B04-01 34.5 kV Cable Replacement - R-Line (CM Team Extension) (221028).pdf
6M8180A02-02 01RQ-150 HMC Central Warehouse CM Services Supplement for Closeout (221116).pdf
2023
January-March
6M8180 B01-02 Concord Yard Turntable Replacement Extension (230125).pdf
April-June
6M8180B04-02 34.5 kV Cable Replacement - R-Line (CM Team Extension) (230420).pdf
6M8180 A10 CM Support for TOD & BHQ (230425).pdf
6M8180 B01-03 Concord Yard Turntable Replacement Extension (230505).pdf
July-September
6M8180 A11-01 47CJ-230A Fare Gates Project PM CM Support (230714).pdf
6M8180 B.01-04 Concord Yard Turntable Replacement Extension (Extension) (230720).pdf
6M8180 B.02-02 Hayward Yard Fire Protection (Extension) (230802)
October-December
2024
January-March
6M8180 B.02-03 Hayward Yard Fire Protection - CM Extension (240329)
April-June
July-September
6M8180 A.12-01 Program Project Management Support (240726).pdf
6M8180 A.11-02 PM CM Support for Next Gen Fare Gates Project (240730).pdf
6M8181 (ATKINS N.A.)
2020
October-December
6M8181A01-01 Construction Inspection Services for the TBT Internal (201201).pdf
2021
April-June
6M8181B01-01-Engineering Support on Escalator Reliability(210521).pdf
October-December
2022
January-March
6M8181B03-01 – Lidar Systemwide Survey Control (220214).pdf
April-June
6M8181B01-02 – EERMS Resident Engineer & Administrative Support (220401).pdf
October-December
6M8181B05-01 Contracts Change Order Review Audit (221121).pdf
6M8181 B03.02 LiDAR Systemwide Survey - Amendment 1 (221229).pdf
2023
January-March
6M8181 A03-01 Change Order Review (230119).pdf
6M8181 B06-01 UPS Field Engineering Support Services (230328).pdf
April-June
6M8181 B02-01 Assistant Resident Engineering Services (230508).pdf
6M8181 B02-02 ARE Support for Civil and Structures Projects (230510).pdf
July-September
6M8181 B07-01 Measure RR Traction Power Engineering, Design Support During Construction (230717).pdf
October-December
6M8181 A04-01 Core Capacity Project Analytics and Controls Support (231011).pdf
6M8181 B09-01 CWC Substation DSDCN (231011).pdf
2024
January-March
April-June
6M8181 B.06-02 UPS Field Engineering Support Services (240610).pdf
July-September
6M8181 B.02-03 Assistant Resident Engineer Support for Structures and Tracks Programs (240829).pdf
6M8187 (CPM Associates)
2020
April-June
6M8187A01-01 – CBTC CM Oversight Services (200617).pdf
6M8187A02-01-BART Core Capacity Program Technical Support(210521).pdf
October-December
6M8187A01-02 CBTC CM Support October 2020 to June 2021 (201020).pdf
2021
July-September
6M8187 A03-01 CM Oversight Manager (FY22 & FY23) (210811)(Rev 231114)(Rev 231227).pdf
2023
October-December
6M8187 A04-01 49GH008 - CBTC - Consor - Construction Management Oversight (231114)_0.pdf
6M8168 (Parsons)
2020
July-September
2021
January-March
6M8168A.01-02 – DSDC (210107).pdf
6M8168A02-01 – VTA BART Silicon Valley Extension Phase 2 (210324).pdf (updated)
6M8168A03-01 BART DSDC CBTC (210813).pdf
2023
January-March
2024
April-June
6M8168 A.05-01 Parsons DSDC for 14 Months May 01, 2024 to June 30, 2025 (240506)_0.pdf
6M8169 (Systra)
2020
July-September
6M8169A01-01 – BART Design Services During Construction for Train Control Modernization Program (200831).pdf
6M8169A01-02 DSDC CBTC Staffing (210503).pdf (updated)
2021
July-September
6M8169A02-01 CBTC DSDC Staffing (210908).pdf
2023
April-June
2024
April-June
6M8169 A.04-01 Systra DSDC for 12 Months June 01, 2024 to May 31, 2025 (24606) (rev 240823).pdf
6M8182 (Ghirardelli)
2020
October-December
6M8182A.01-01-Core Capacity Program (Updated 210503).pdf
6M8182B06-01Project Management Support (updated 210503).pdf
2021
January-March
6M8182B03-01 – Provide CM support for Track Interlocking Replacement Program (210222).pdf
6M8182B01-01 – Office EngineerAdministrative Services for CM Support (210216).pdf
6M8182B07-01 – Material Procurement and RR Warehouse Support (210312).pdf
6M8182B02-01 – Provide OE, Scheduler and Inspector for OEG Project (210317).pdf
April-June
6M8182A.02-01 E-BART Vehicle Contract Support (210421).pdf
6M8182B04-01- Track Geometry Car Procurement (100521).pdf
6M8182B06-02-Project Management Support for BART RR and FTA Projects (180521).pdf
6M8182A03-01- CBTC Enabling Works Switch Machine (100621).pdf
6M8182B05-01-Traction Power Substation Procurement (070621).pdf
6M8182A05-01-Ghirardelli Powell Street Station Modernization Project( 180621).pdf
6M8182A04-01 Antioch Station Parking Expansion Project CM Supplement #3 (210421).pdf
July-September
6M8182A17-01-A65 A75 Interlocking Renewal Extension(010721).pdf
6M8182B09-01 – 34.5 kV AC Cable Replacement A-Line (210716).pdf
6M8182B10-01 – Traction Power Substation and ASL Installation (210803).pdf
6M8182A04-02 – Construction Management Services for eBART Antioch Station Parking Lot (210916).pdf
October-December
6M8182A08-01 – CM Support for HMC (Phase 1) Closeout Activities (211101).pdf
6M8182A06-01 – Millbrae Tail Tracks Extension (211108).pdf
6M8182 A.07-01 – Balboa Park Station Passenger Drop-Off Area Plaza (211108)(Rev 240208)_1.pdf
6M8182B15-01 - Project Management Support for Traction Power Capital Projects (211227).pdf
2022
January-March
6M8182B14-01 – RE Services for Portable Traction Power Substation (220114).pdf
6M8182A10-01 – Program and Document Control Support (220224).pdf
6M8182B13-01 – PM Support for Communications and Systems and Data Informatics (220301).pdf
6M8182A11-01 – CM Support for Powell Station Modernization Project (220303).pdf
6M8182B07-02 – Material Procurement, Procurement Support, and RR Warehouse Support (220316) .pdf
April-June
6M8182A12-01 – CM Services for HMC Phase 2 Civil Grading Contract (220606).pdf
6M8182 A03-02 - CBTC Enabling Works Project Field Engineer, Inspector and Inventory Specialist (220621)(Rev231229)_0.pdf
6M8182B02-02 – Oakland Emergency System (OEG) - CM (220608).pdf
July-September
6M8182B04-02 - Track Geometry Car Procurement - Extension (220803).pdf
6M8182A11-02 CNMGT - Ghirardelli - Powell Street Station Modernization Project (220818).pdf
6M8182B17-01 Lafayette Station Site Improvements - Claim Support (220822).pdf
October-December
6M8182B06-03 Electrical Projects Manager Continued Support (221201).pdf
2023
January-March
6M8182B07-03 Material Procurement and RR Warehouse Support (230215).pdf
6M8182B15-02 Traction Power Project Management Support 2023 (230316).pdf
6M8182B04-03 Track Geometry Car Procurement - Scheduler (Extension) (230323).pdf
6M8182A10-02 09AU-120 Program and Document Control Support (230330).pdf
6M8182A13-01 01RQ-101 Construction Management Support for Special Trackwork Inspections (230330).pdf
April-June
6M8182 B18-01 Traction Power Engineering Support for M & E (230428).pdf
6M8182 B1901 Electrical and Systems Program Management Support 2023 (230428).pdf
6M8182 A11-03 Ghirardelli - CM Services - Powell Station Modernization Project (230508).pdf
6M8182 B21-01 Project Management Support for Substation projects (230601).pdf
6M8182 B11-01 TCCCP New Traction Power Facilities West Bay Project (230613).pdf
July-September
6M8182 A.13-01 Provide Support for Special Trackwork Inspection (230713).pdf
6M8182 B.02-03 Oakland Emergency Generator - Extension (230717) (rev 240223) (rev 240814).pdf
6M8182 A10-03 09AU-120 Program and Document Control Support (230906).pdf
October-December
6M8182 B11-02 TCCCP New Traction Power Facilities West Bay Project - CM Extension (231108).pdf
6M8182 A11-04 CNMGT - Ghirardelli - Powell Street Station Modernization Project & NGFG (231212).pdf
2024
January-March
6M8182 B.03-04 Procurement and Field Support on Track Projects (240209).pdf
6M8182 B.15-03 Traction Power Project Management Support Contd. (240214).pdf
April-June
6M8182 B.14-03 Construction Management services for Portable substation project 240614.pdf
July-September
6M8182 B.07-04 Engineer Support for Capital Construction Division (240918).pdf
6M8182 B.23-01 DSDC for TCCCP West Bay - Scheduler (240927).pdf
6M8183 (TRC Engineers, Inc.)
2020
January-March
6M8183A65-A75 – The Work Plan is to provide Resident Engineering Services for the A65A75 Interlocking Renewal Project (210308).pdf
6M8183B02-01 – Contract work is to providng engineering services to continue design work begun by STV under Agreement No. 6M8123 WP B.09. (210125).pdf
6M8183A02-01 – Design Services During Construction (DSDC) for ESP TBT (210317).pdf
April-June
6M8183A.04-01 Antioch Station Parking Expansion Project CM Supplement3 (210421).pdf
2021
April-June
6M8183B.05-01–Communications Engineering Design Support(260421).pdf
6M8183A03-01-19th St Station Mod (100621).pdf
July-September
6M8183A05-01 Design Support During Construction (DSDC) for Market Street Entry Canopies (210805).pdf
October-December
6M8183B06-01 – DSDC for BART Blocking Scheme Project (211006).pdf
6M8183B07-01 – Replacement Contract 15EK-145 Transbay Tube East KTE TPSS Installation DSDC (211012).pdf
6M8183B08-01 – CM Services for A77 Interlocking Renewal, Ultrasonic Testing & Rail Procurement (211108).pdf
6M8183A07-01 – TCMP Enabling Works Contract 49GH-130 Resident Engineer (211108).pdf
6M8183 A.06-01 - Powell Station Modernization Project - Design Support during Construction (DSDC) Continuation (211116).pdf
2022
January-March
6M8183B04-01 – 34.5kV C Line Cable Replacement - DSDC (220119).pdf
6M8183 A.08-01 - Market Street Entry Canopies TRC CM Support (220420).pdf
April-June
6M8183 A.06-02 - TRCSTVYEI - DSDC for Powell Station Modernization Project (220504).pdf
2023
January-March
6M8183 A01-01 HAYWARD MAINTENANCE COMPLEX (HMC) PHASE II PROJECT (230323).pdf
April-June
6M8183 A01-01 HAYWARD MAINTENANCE COMPLEX (HMC) PHASE II PROJECT (230627).pdf
July-September
October-December
6M8183 B.10-01 TPSS (CWC) CM Team (231002)
6M8183 A12-01 CM Support for Enabling Works Construction Project (231121)
6M8183 B.12-01 47CJ112_NGFG_PM CM Support (240911).pdf
6M8176 (PGH Wong Engineering, Inc.)
2021
January-March
6M8176B.05-01 – Track Engineering and Maintenance Classes (210308).pdf
6M8176B.07-01 – Procurement of Train Control Room Multiplex (MUX) and Speed Encoding System Equipment Contract (210308) Updated.pdf
6M8176A.01-01 – CBTC Enabling Works Construction Contract CM Services RE and Assistant RE (210111).pdf
6M8176B.02-01 – DSDC service for Turntable Replacement Project - Concord Yard (OCY) (210310).pdf
6M8176B.06-01 – Operating & Capital Programs RR Earned Value Management Support (210317).pdf
6M8176A.04-01 – Project Support for the Stations Design and Construction (210317).pdf
6M8176A.05-01 – Core Capacity Program Projects Office Engineer (210323).pdf
6M8176B.08-01 – Earthquake Response Team (210331).pdf
6M8176 A03-01 01RQ-102 HMC (Phase 2) Civil Grading DSDC Services (210323).pdf
April-June
6M8176B.04-01 Oakland Emergency Generator System (210414).pdf
6M8176B.03-01– Track Allocation program management support (220421).pdf
6M8176A02-01-Program Management Support (040521).pdf
6M8176B10-01-Traction Power Substation ASL Installation(150621).pdf
6M8176B11-01-Non RR EVM Support(160621).pdf
July-September
6M8176A06-01-Core Capacity Program Management (010721).pdf
6M8176B12-01 – Systemwide HVAC Upgrades (210719).pdf
6M8176A07-01 CM Support for Parking Garage LED Lighting Project (210805).pdf
October-December
6M8176 A.09-01 - Transbay Corridor Core Capacity Program (211116).pdf
6M8176 A.08-01 - General Construction Management Services (211116).pdf
6M8176A10-01 – 01RQ-110 - CAD Record Drawings for the Component Repair Shop (211207).pdf
6M8176B14-01 – 34.5kV AC Cable Replacement A-Line RE + ARE (211210).pdf
2022
January-March
6M8176A12-01 – CBTC Contracts Manager (220107).pdf
6M8176 A.13-01 – Enabling Works Material and Procurement Support (220114) (rev 240715).pdf
6M8176 B.01-02 - Traction Power Procurement and Planning Support (220418).pdf
6M8176 B.15-01 - Traction Power Engineering Support For (220418).pdf
6M8176 B.12-02 - Systemwide HVAC Upgrades - Extension (220427).pdf
July-September
6M8176A14-01 CBTC Enabling Works Contract 49GH-135 Resident Engineer and Assistant RE (220816).pdf
6M8176B04-02 Oakland Emergency Generator - Extension (220825).pdf
6M8176B17-01 KTE Substation - CM Extension (220825).pdf
6M8176B08-02 - Earthquake Response Team (ERT) Implementation Program (220902).pdf
October-December
6M8176B06-02 Earned Value Management Support (221010).pdf
6M8176B01-03 Traction Power Procurement and Planning Support Specialist (221011).pdf
6M8176C01-01 Ad Franchise Technical and Project Management Support (221011).pdf
6M8176B18-01 Trunked Radio Project - Extension (221028).pdf
6M8176A17-01 Wayfinding and PA Improvements CM (221031).pdf
6M8176 B.20-01 Construction Management - Construction Coordination (221121) (rev 240808).pdf
6M8176BB19-01 Construction Coordination Cell Extension – D&C (221121).pdf
6M8176B17-02 KTE Substation - CM Extension (221122).pdf
6M8176B.21-01 Construction Coordination Cell ME CM Support (221125).pdf
2023
January-March
6M8176 B.07-02 NS MUX - Extension (220114) (rev 230202) (rev 240807) (rev 240821).pdf
April-June
6M8176 B09-01-Construction Management (230516).pdf
6M8176 A18-01 CM Support for Enabling Works Construction Project 49GH006 (230522).pdf
6M8176 A15-02 WongCMS WP (230601).pdf
July-September
6M8176 B17-03 KTE Substation - CM Extension (230707).pdf
6M8176 A.07-02 Retrofit Parking Garage Lighting - CM Extension (230929)
October-December
6M8176 B01-04 Traction Power Procurement and Planning Support for Measure RR Projects (231115)
6M8176 B06-03 EVM Support for Capital Projects (231214)
6M8176 B.14-02 34.5 kV AC Cable Replacement A-Line Extension - RE (231229).pdf
2024
January-March
April-June
6M8176 A.15-03 WongCMS (240416).pdf
6M8177 (PreScience)
2020
October-December
6M8177B.02-01 – Work Plan Proposal for Safety Specialist Services for Capital Loading Projects ‐ Extension (200123).pdf
6M8177A.01-01 – Construction QA Inspection for BART ESP ‐ Transbay Tube Seismic Retrofit (201113).pdf
2021
April-June
6M8177B03-01-Continued Wheel Rail Optimization Services(260521).pdf
6M8177B04-SVBX Phase II (010621).pdf
July-September
6M8177A04 – Powell Street Station Modernization Project (210723).pdf
6M8177B04-01 Project Management and Resident Engineering Services for SVBX PH II (210805).pdf
6M8177B05 – CM Support 34.5 kV AC Cable Replacement and Fiber Optic Cables Installation (210927).pdf
October-December
6M8177B06-01 – CBTC Industry Expert (211221).pdf
2022
January-March
6M8177B07-01 – Fare Gate Renovation and Rehabilitation (220301).pdf
April-June
6M8177B08 – Aerial Structure Fall Protection (A-Line North) Support (220607).pdf
6M8177B13-01 - BSVII Resident Engineering Services (220628).pdf
6M8177B09-01 – 34.5 kV Cable Replacement - M-Line (220621).pdf
July-September
6M8177 B.10 - Scheduling Support for Mechanical, Electrical and Traction Power Projects (220720).pdf
6M8177 B.01-02 - NRVE Procurement Support (220803).pdf
6M8177 B11-01 - 34.5 kV Cable Replacement M-Line Extension (220803) (Rev 231128)_0.pdf
6M8177B01-02 NRVE Procurement Support (220803).pdf
6M8177B14-01 Track Geometry Car Procurement - Extension (220923).pdf
October-December
6M8177B15-1 OKS Geometry Vehicle Storage & Spur Track Project (221122).pdf
6M8177B08-2 Aerial Structure Fall Protection (A-line North) (221122).pdf
2023
January-March
6M8177 A04-2 CNMGT - PreScience - Powell Street Station Modernization Project (230228).pdf
April-June
6M8177B.15-02 OKS Geometry Vehicle Storage & Spur Track (G-Spur) – Extension (230418).pdf
6M8177 A04-3 Prescience - CM Services - Powell Station Modernization Project (230502).pdf
6M8177 B12-02 Track and Structures Planner in PM Planning and Scheduling Group (230504).pdf
6M8177 B09-02 34.5 kV Cable Replacement - M-Line - (CCTV CO Work) (230508).pdf
6M8177 B14-2 Track Geometry Car Procurement – Extension (230601).pdf
July-September
6M8177 B.05-02 34.5 kV Cable Replacement - A Line (CM Extension) (230815)
October-December
6M8177 A.04-04 Powell Modernization - Continued CM Services - Close Out Phase - Prescience (231114)
2024
January-March
6M8177 B.14-3 Procurement Support for Track Geo Car, Rail Grinder Retrofit (240104).pdf
6M8177 B.12-3 Scheduling Support for Capital Projects (240208).pdf
6M8177 B.16-1 Rev 1 Scheduling Support for Capital Projects (240328).pdf
April-June
July-September
6M8177 A.04-5 CM Support for Powell Street Modernization Project (240722).pdf
6M8177 B.01-03 NRVE Procurement Support (241003).pdf
October-November
6M8177 B.17-1 Assessment of Acoustic Panel Fasteners (Continuation in 2024) (241029).pdf
6M8178 (WSP)
2022
April-June
6M8178B01-01 – TCCCP West Bay Substation DSDC Services (220401).pdf
6M8178A01-01 - 09AU-120 Office Engineering Support (220621).pdf
6M8178B03-01 – 34.5 kV Cable Replacement - M-Line (CCTV CO Work) (220607).pdf
July-September
6M8178B02-01 34.5kV A Line Cable Replacement - DSDC (220825).pdf
6M8178B04-01 BART Internal Strategic Partnering (220830).pdf
6M8178B05-01 MM21 Storm Drain and Retaining Wall Repair (220923).pdf
6M8178B06-01 34.5kV Cable Replacement M-Line - Extension (220923).pdf
October-December
6M8178 B07-01 Project Management Support for ME Projects (221229).pdf
2023
January-March
6M8178 A01-02 09AU-120 Construction Contract Close-Out Support (230314).pdf
April-June
6M8178A.02-01 03QJ-110A_WSP_CM_Concord Yard Wheel Truing Facility (230414).pdf
July-September
6M8178 B03-02 34.5 kV Cable Replacement - M-Line - (CCTV CO Work) Extension (230707).pdf
October-December
6M8178 B07-02 PM Support for OID Projects in Construction (231115)
6M8178 B01-02 TCCCP West Bay Substation DSDC Services (231114)
6M8178 A01-03 09AU-120 Construction Contract Close-out Support (231219).pdf
2024
January-March
6M8178 B.02-02 34.5kV A Line Cable Replacement - DSDC Contd. (240214).pdf
April-June
July-September
6M8179 (HDR)
2020
October-December
6M8179A01-01 Earthquake Safety Program - PBT Retrofit (201201).pdf
2021
April-June
6M8179A.02-01 CNMGT - HDR - Powell Street Station Modernization Project (210414).pdf
July-September
6M8179A02-02 – Powell Station Modernization (210709).pdf
6M8179A03-01 Construction Support Services for North Berkeley Access Improvements (210805).pdf
2022
January-March
6M8179A02-03 – CM Services - Powell Station Modernization (220114).pdf
6M8179 A04-01 – CM for BART Accessibility Improvement Program (220201) (Rev 240412) (Rev240808).pdf
April-June
6M8179B01-01 - Resident Engineering Service (220624).pdf
2023
January-March
April-June
6M8179 B.02.01 Train Control Room Battery Replacement (230427)(Rev240419)(Rev240613).pdf
July-September
October-December
6M8179 B01-02 Resident Engineering Services for 4 contracts (231120)
6M8179 B04-01 Station Emergency (231206) (rev240703).pdf
2024
January-March
6M8179 B.05.01 Concrete scanning at stations for new fare gates (240122) (rev240806).pdf
April-June
6M8179 B.02-02 Train Control Room Battery Replacement (CM team extension) (240610).pdf
July-September
6M8179 A.06-01 Construction Support, Ashby Access Improvements (240702).pdf
6M8179 B.06-01 Resident Engineering Service (240725).pdf
6M8179 B.02-02 Train Control Room Battery Replacement (CM team extension) (240725).pdf
6M8179 B.03-01 Anchor special inspection for new fare gates installation (240903).pdf
6M8179 B.04.02 Station Emergency Lighting (240913).pdf
6M8179 A.04-02 CM for BART AIP Construction Project 15NU-140 & 145 (240926).pdf
October-December
6M8179 B.02.03 Train Control Room Battery Replacement (CM team extension) (241007).pdf
6M8210 (Jacobs)
2023
October-December
2024
January-March
6M8210 A.04-01 Programmatic Support for Capital Construction Division Part B (240320).pdf
October-December
6M8212 (PGH WONG)
2024
October-December
6M8212 A.04-01 Support for Earned Value Analysis (241011).pdf
6M8213 (TY Lin + TSE Joint Venture)
April-June
July-September
6M8213 No. A.01-01 TCCCP West Bay Substations Engineering Support Contd. (240801).pdf
6M8214 (WSP)
April-June
July-September
October-December
6M8214 A.01-01 MPS Substation Replacement Design Services (240805).pdf
6M6146SC1 (HDR Engineering)
2021
July-September
6M6146 SC1 A01-01 – Engagement and Outreach Phase 0 (210929).pdf
October-December
6M6146 SC1 A01-02 – Engagement and Outreach Phase 0 Government Affairs (211210).pdf
2022
April-June
6M6146-SC1 A02-01 Engagement and Outreach Services - Link21 (220422)_0
2023
January-March
6M6146 SC1 A02-02 Government and Agency Relations - Link 21 (230201).pdf
July-September
6M6146-SC1 A02-03 Engagement and Outreach Services - Link 21 (Supplemental) (230823).pdf
2024
January-March
6M6146-SC1 A.02-04 Link21 Engagement Outreach (240322)
6M6146SC2 (Cambridge Systematics)
2021
July-September
6M6146-SC2 A01-01 – Travel Demand and Land Use (210916)(Rev 231114)(Rev231214).pdf
2023
July-September
6M6146SC3 (Arup/WSP JV)
2021
October-December
6M6146SC3A01-01 – Planning + Engineering WP 1.0 (211022).pdf
2023
April-June
6M6146SC3 A02-01 – Link21 Planning & Engineering Consultant WP 2 (230425)_0.pdf
October-December
6M6146-SC3 A02-01 – Planning & Engineering, Phase 1 Stage Gate 2 (230425)(Rev 231114)
6M6146SC4 (ICF Jones & Stokes)
2021
October-December
6M6146SC4A01-01 – Environmental WP 1.0 (211022).pdf
2022
April-June
6M6146-SC4 A.02-01 - Link21 Environmental Consultant Work Plan 2 (220425).pdf
6M5164 (AEW Engineering, Inc.)
2022
April-June
6M5164 C.01-01 - System Wide Hazardous Waste and Material Guidelines (220526).pdf
October-December
6M5164C01-02 Materials Guidance Flow Charts (221216).pdf
2023
January-March
6M5164C02-01 System Wide Waste Minimization Plans and Analysis (230127).pdf
6M5164C03-01 Pleasanton Substation Station SPCC (230127).pdf
6M5164C04-01 E-waste minimization (230127).pdf
April-June
6M5164 C05-01 L30 SPCC Plans (230523).pdf
6M5164 C06-01 Industrial General Permit Stormwater Compliance (230601).pdf
2024
January-March
April-June
July-September
6M5164 C.08-01 EHS Warehouse Audits (240816).pdf
6M5159 (C2PM)
2022
April-June
6M5159C01-01 – DTSC Inspection for WSX and OAE (220613).pdf
6M5159C02-01 - Hazardous Waste Disposal (220622).pdf
October-December
6M5159C03-01 Stormwater Inspection BART Stations (4) (221216).pdf
2023
January-March
6M5159C05-01 DTSC Required 5 Year Review OAE and WSX Compliance (230127).pdf
April-June
6M5159C06-01 Bulk Liquid Hazardous Waste Disposal (230420).pdf
July-September
6M5159 C07-01 L10 and L20 SPCC Inspections and Updates (230711).pdf
October-December
6M5159 C.08-01 December 2023 DTSC Inspection (231206).pdf
2024
January-March
April-June
July-September
6M5164 C.10-01 Stormwater Industrial General Permit Support (240812).pdf
6M5164 C.09-01 Water Balance Study (240812).pdf
6M6155 (HNTB)
2022
April - June
6M6155 A01-01- PMC Services for Stage Gate 2 (220628)
2023
October-December
6M6155 A01-02 Link21 Opinions Research (231006)
6M6155 A02-01 Strategic Advising and Program Management v2 (231024)
6M4802 (Larson Valuation)
2023
January-March
6M4802A02-01 HMC2 East Storage Yard Appraisal Report (230203).pdf