Search

Search Results

Station Access Signage Standards

Download a copy of the draft Station Access Signage and Wayfinding Guidelines (SASWG), and provide your comments below!What Is Station Access Signage?

Clipper Customer Service

 The Metropolitan Transportation Commission (MTC) manages the regional Clipper® Card for San Francisco Bay Area transit agencies, including BART. Clip

Videos

BART System Maps 1972-2020 50 Years of BART | Beginning with BART 50 Years of BART | A Matter of Pride 50 Years of BART | Along the Way 50 Years of BART | Three to Get Ready 50 Years of BART | A Vision to Reality 50 Years of BART | The Transbay Tube 50 Years of BART | Building the Transbay Tube 50 Years of

Historical Documents

Historical Reports List of BART Chronology (1947-1991) BART History in the Making 1957 Rapid Transit Commission Report 1961 Parsons Brinckerhoff-Tudor-Bechtel Engineering Report 1962 The Composite Report BART, Prepared by Parsons-Brinckerhoff-Tudor-Bechtel 1964 BART General Manager B.R. Stokes' Memo to the

Copyright, Trademark, Terms and Conditions

CopyrightAll content on the San Francisco Bay Area Rapid Transit District (BART) website (http://www.bart.gov) including the collection, arrangement, assembly and presentation of pages and all logos, maps, text, images, feeds and databases are the property of BART or its content suppliers and are protected by

Service resumes following medical emergency at Embarcadero Station

Service StatusBART has resumed normal service following a major service disruption at Embarcadero BART Station. Expect residual delays. What HappenedAt approximately 2:00 pm, a person was reported on the floor of a train car. Emergency personnel responded and BART service was restored at around 3:30 pm. Keep

Stories

To learn the story of BART, look to its system maps BART's maps tell a story of their own. From the original system map, with its dark blue and gray background, to the most recent map, take a voyage through time by way of BART's maps. Read Full Story One man’s fight to make BART accessible for all Harold

繁體中文

BART 是什麼? 舊金山灣區捷運 (Bay Area Rapid Transit,簡稱 BART) 是在灣區營運的重軌鐵路系統。 服務時間 BART 星期一至星期五的服務時間是上午 5 時至晚上午 12 時。星期六的服務時間是上午 6 時至晚上午 12 時. 星期日的服務時間是上午 8 時至晚上午 12 時。 若要查詢完整的列車時刻表,請瀏覽 www.bart.gov /schedules。或者,您亦可上網站 bart.gov/planner 或從 Apple iOS 或 Android 商店下載 BART 官方應用程式,使用我們的線上行程規劃工具。 BART 車費 4 歲和以下兒童可免費搭乘