Elevator flooring work Civic Center/UN Plaza 8/29-9/2 UPDATE
Updated: 9/2/2016 The work has been completed and both elevators have been restored to service. Updated: 8/30/2016 New completion date: 9/9/2016 Due to unexpected levels of corrosion in the flooring requiring extensive repair work. We will replace the flooring in our street-level and platform-level elevators
Service restored after early-morning train incident; residual delays possible
Service was restored around 8:45 am Thursday on three East Bay lines after an early-morning fire reported on a train that caused major delays for several hours. Small residual delays may be expected as service resumes. The incident began around 4:30 am after reports of a fire outside the last car on a three
Additional Surface Parking Areas to Close at Millbrae Station (Phase 4) Update
On Saturday, February 22, 2020, the Gateway at Millbrae Station project will close the southwest portion of the surface parking lot located between the Station and Rollins Road to prepare for construction. (Please see the map on the reverse). All areas will be signed at least 72 hours in advance of closures
Police take assault suspect into custody in connection with fight on train
(Update 2/18/20 10:10 am) The suspect, Tommy Robert NAVARRETTE (D.O.B. 5/16/1975, Los Angeles), was booked into Alameda County jail (Santa Rita) in Dublin on 2/15/2020. _____________________________________________________________________________________________________________________________________________
YVR Crosswalk closing 11/26 to January 2019 Update 12/6
As part of the Walnut Creek Transit Village development project, the contractor will build a new sidewalk, roadway, and other site improvements along the north side of Ygnacio Valley Road. The sidewalk in this area and the crosswalk to the south side of Ygnacio Valley Road and Oakland Blvd. will be closed
All Remaining Surface Parking Lots at Millbrae Station to Close Monday, March 23, 2020
On Monday, March 23, 2020, the Gateway at Millbrae Station project will close all remaining surface parking lots. (Please see the attached map). All areas will be signed at least 72 hours in advance of closures. The parking garage will remain open during all phases of construction; however, a portion of the
Entrance Closure Alert: Civic Center Station entrance at 8th and Market closed 5/9/22 for work on new canopy
On Monday, May 9th, 2022, our contractor will build a work enclosure around the 8th Street and Market entrance to Civic Center Station. The entrance on the southwest side of the station will be closed off to public access for approximately six months while a new protective escalator canopy is built. The
Entrance Closure Alert: Embarcadero Station entrance at Davis and Market closed for work on new canopy
On Monday, June 13th, 2022, our contractor will build a work enclosure around the Davis and Market entrance to Embarcadero Station. The entrance in the middle of the station will be closed off to public access for approximately six months while a new protective escalator canopy is built. The canopy will
On the front line of customer service: Station Agents see it all
Station Agents are the face of BART for many riders but the position might be one of the most misunderstood in the agency. On the latest edition of our podcast series "Hidden Tracks: Stories from BART" we take an in-depth look at Station Agents and the challenges they face on the job. Great customer service
Spare the Air free transit program completed
The free transit Spare the Air program has concluded. Friday, July 21 was the sixth and final budgeted free BART Spare the Air day of the year. The free rides were offered on the first six non-holiday weekday Spare the Air days this summer. The Bay Area Air Quality Management District will continue to declare