Search Results
BPD releases new information on robbery suspect
Update 10/12/2017: The suspect, 37-year-old Fredachi Stone, was arrested by Fremont police early Thursday morning (10/12) after he was stopped for jaywalking at 3am. BART police are asking for the public’s help to locate a suspect who robbed a woman aboard a BART train the morning of September 11 th. The
Earthquake Safety work on two stairwells at Hayward Station
As part of our systemwide Earthquake Safety Program, BART will begin strengthening both stairwells at the Hayward Station to better withstand future earthquakes. Beginning February 2017 work areas will be enclosed and you may see personnel and large equipment accessing the site. The work will involve
Immediate repair work begins on traction power cables between El Cerrito Plaza and El Cerrito del Norte stations
BART has expanded our repairs to failed electrical lines that are critical for maintaining train service to now include the area between El Cerrito Plaza and El Cerrito del Norte station. This critical infrastructure work along the Richmond line was started in January 2021 at the North Berkeley station. This
Normal Red Line service now restored with up to 10-car trains
5/6/22 Update Longer trains are once again running on the Red (Richmond to Millbrae + SFO) and Orange (Richmond to Berryessa) lines following ongoing cable replacement work between the Richmond and El Cerrito del Norte stations. In early March, BART experienced a cable fault that forced us to operate train
Two elevators at Daly City out of service through Sunday Oct 26
The two BART elevators that serve the pedestrian tunnel under John Daly Boulevard, located south of the Daly City BART Station will be closed and inaccessible to the public starting Friday, October 24 through Sunday, October 26. BART will complete necessary work to repair the units and get them back in
Late-night work over next 14 months will strengthen Transbay Tube against a quake
Inside the fabrication building, a custom-built plate-handling vehicle carries a steel plate to be used for reinforcement. By Melissa Jordan BART Senior Web Producer In a carefully choreographed late-night dance over the next 14 months, a custom-built truck with cranes attached will roll onto BART tracks
Parking Fees Increase in July
There will be a $0.50 daily parking fee increase at many stations starting in the month of July, 2014. Below are the dates of the new parking fee for each station (and the new daily fee). Monday, July 14, 2014Bay Fair ($2), Fremont ($2.50), Fruitvale ($2.50), Lafayette ($2.50), Lake Merritt ($2.50), Orinda (
J.J.'s Day: Utility worker is first to move up to electronics technician through pilot program
By MELISSA JORDANBART Senior Web Producer Surrounded by colleagues and mentors from the Richmond maintenance shop, Jarone "J.J." Asberry on Wednesday became the first BART employee to graduate from a new Utility Worker-to-Transit Vehicle Electronic Technician (TVET) workforce development program. A utility
Ratings for on-time performance, seat cleanliness rise in latest customer satisfaction survey
Customers’ overall satisfaction with BART is up with gains in ratings for on-time performance and cleanliness of seats, reflecting investments in the system such as the installation of new, easier-to-clean vinyl seats. Photo by David M. Anderson via Flickr. New vinyl seats like these have been popular with